8minutenergy commissions 155MW solar project in California

Facebook
Twitter
LinkedIn
Reddit
Email
The 155MW project is located on approximately 283 hectares of abandoned farmland 112km north of Los Angeles. Image: Swinerton Renewable Energy

Independent PV developer 8minutenergy Renewables and D.E. Shaw Renewable Investments announced Monday that the 155MW Springbok 2 Solar Farm in Kern County, California, has been commissioned.

Springbok 2 joins the 105MW Springbok 1 Solar Farm, which was commissioned earlier this year.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Located 112km north of Los Angeles, the two Springbok installations are expected to generate enough energy to supply clean power to over 110,000 homes in southern California through power offtake partner, Southern California Public Power Authority (SCPPA).

Swinerton Renewable Energy (SRE) served as the engineering, procurement, and construction (EPC) contractor, with construction management overseen by 8minutenergy and DESRI.

Michael Webster, LADWP executive director of power system engineering and technical services, said: The Springbok solar projects are integral to meeting Los Angeles’s renewable energy targets of 25% by 2016 and 33% by 2020. We are pleased to have a project of this size, scope, and importance completed on-budget and ahead of schedule.”

Springbok 2 Solar Farm is located on approximately 283 hectares of abandoned farmland taken out of production more than 20 years ago. 8minutenergy began developing the project in 2011, creating an estimated 300 direct and 400 indirect jobs during construction in Kern County.

 The amount of greenhouse gas emissions expected to be avoided each year through operation of the projects is comparable to removing 111,000 cars from the road.

George Hershman, senior vice president and general manager of Swinerton Renewable Energy, added: “Projects like Springbok 1 and 2 produce affordable, locally generated electricity while providing significant benefits to the local economy through job creation and collaboration with area businesses. Over 700 people worked on-site at Springbok 1 and 2 throughout the construction process.”

8 October 2024
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 8-9 October 2024 is our second PV CellTech conference dedicated to the U.S. manufacturing sector. The event in 2023 was a sell out success and 2024 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Sydney, Australia