Oncor launches PV incentive program

Oncor has launched its first solar power initiative, the Take A Load Off, Texas Solar Photovoltaic Incentive Program. By providing cash incentives to qualified homeowners, businesses and governments to add PV power systems in Texas, it aims to stimulate development of solar energy, create jobs for experienced installation professionals, and increase solar system accessibility.

Oncor expects that their four-year, US$16 million program will successfully install approximately 1,400 new solar power systems. Only homes, businesses and government buildings that are served by Oncor are deemed eligible to participate.

“The Take A Load Off, TexasSM, Solar PV Incentive Program is an exciting and innovative project, the first of its kind for Oncor,” said Michael Stockard, Oncor’s Director of Energy Efficiency Programs. “With so much interest in the solar power industry at the state and national level, Oncor’s Solar PV Program is the right idea at the right time.”

Ocor’s payout will be US$2.46 per DC watt, with a maximum of US$24,600 for each residential installation, and US$246,000 for all others. Most residential solar panel projects range from 1 to 10kW, and businesses and government installations could receive incentives for projects of 100kW, with even larger installations considered.

Oncor plans to offer 11 additional programs this year in order to promote renewable energy, which will contribute to a total of 31 Oncor energy efficiency programs. This makes Oncor one of the largest energy efficiency initiatives sponsored by a regulated utility in Texas.

“Oncor is committed to helping consumers find creative ways to save energy, protect the environment and reduce emissions,” stated Stockard. “Consumers and businesses are interested in solar power and want to learn more. The Solar PV Program will help consumers understand the benefits of installing and operating a solar PV system.”

Newsletter

Preview Latest Subscribe
We won't share your details - promise!

Publications

  • Photovoltaics International 14th Edition

    Photovoltaics International 14th Edition

    Published in November 2011, the 14th edition of Photovoltaics International provides a variety of technical papers from some of the industry’s stalwarts. Features include: TÜV Rheinland on junction box testing; Laser Zentrum Hannover on laser edge isolation of mc-Si cells; Calisolar on the importance of traceability; Fraunhofer ISE on EWT cells; and EPIA on Europe’s LCOE.

  • Photovoltaics International Lite, Volume 05 - 2011

    Photovoltaics International Lite, Volume 05 - 2011

    This digital interactive Lite sees Tom Cheyney follow Agua Caliente’s progress on becoming one of first truly utility-scale PV power farms, where 40–50MW (AC) will be commissioned by the end of the year. We also feature one of the world’s largest silicon thin-film PV power plants, Avenal; a report on warnings of the collapse of module prices from Solarbuzz and PI-Berlin presents tips on PV module testing. A print version of this edition will be distributed at Solar Power International 2011 in Dallas, Texas.

  • Manufacturing The Solar Future: The 2011 Production Annual

    Manufacturing The Solar Future: The 2011 Production Annual

    Manufacturing the Solar Future is the primary source guide for detailed information on the PV production process. This annual provides technical details on how the leading companies and research organizations worldwide are addressing this need by dramatically improving their manufacturing processes.

Partners

Acknowledgements

Solar Media