Sundog Energy switches on 240kWp BIPV system at UK’s King’s Cross station

Facebook
Twitter
LinkedIn
Reddit
Email

Sundog Energy and Kier Construction have officially turned on the 204 kWp rooftop BIPV system at King’s Cross railway station in London, UK. Dubbed as one of the largest and most complex building-integrated PV systems in the UK, it is projected to have an output of around 175,000 kWh per annum.

As reported by PV-Tech’s sister site Design Build Solar, the high profile project utilizes 1,392 bespoke glass laminate units designed and supplied by UK-based glass specialist Romag. Sundog Energy was responsible for designing and installing the project whilst Kier Construction was the main contractor.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The installation of the solar glazing system was carried out without closing access to the station. During the installation, temporary scaffolding was erected which also provided shelter from adverse weather when the original roof structure was taken down.

At a press conference this morning, Sundog founder and chairman Martin Cotterell said that “I haven’t been involved in a more challenging project in terms of complexity. I don’t know of any project that comes close to this”.

He added: “King’s Cross has been a fantastic project to work on – but also a labour of love.  The sheer scale of the installation has presented many major technical and aesthetic design challenges from day one and there has been no margin for error as the work had to be undertaken whist the station remained fully operational.  We are very proud of our involvement as we believe the project combines the very best in modern design, technical excellence and sustainability with the grace of one of the UK’s most iconic grade 1 listed buildings.”

Driving the £1.3 million solar project — which began approximately five years ago before the UK feed-in tariff was introduced — was the Network Rail’s ambitions to become greener. The solar project is part of a larger £550 million King’s Cross redevelopment programme which involves strengthening, repairing and refurbishing the 1880s Grade I listed building.
 

Read Next

June 9, 2026
Revolve Renewable Power is acquiring a 125MW portfolio of utility-scale solar development projects in the US.
June 9, 2026
Zelestra has signed a long-term power purchase agreement (PPA) with Meta for the 180MWdc Palmera Solar Plant in Freestone County, Texas.
June 9, 2026
A US Federal judge has revoked a law preventing solar PV and wind projects from qualifying for tax credits by committing 5% of the project’s value.
June 9, 2026
As solar deployments are set for a record year in the US, module supply, quality, and reliability will be key topics of conversation at PV ModuleTech USA 2026.
June 9, 2026
Waaree lands 300MW EPC deal, while Gujarat Inject bags INR10 million module supply order and Vikram Solar eyes US$2.8 billion solar manufacturing hub.
June 9, 2026
Global solar portfolios are increasingly producing fragmented and incomplete data, which can impact project performance and financial returns.

Upcoming Events

Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Media Partners, Solar Media Events
September 9, 2026