REC trims workforce by 3% but upgrades at Singapore production plant continue

Facebook
Twitter
LinkedIn
Reddit
Email
The company said that US$48 million in capital expenditure plans to upgrade all production at its manufacturing facility in Tuas, Singapore to its half-cut PERC cell technology, used in its ‘TwinPeak’ series modules would continue. Image: REC

Integrated PV module manufacturer REC Group has said it has trimmed its global workforce by 3%, or around 65 jobs out of approximately 2,200 employees.

The PV module manufacturer told PV Tech that due to global solar market conditions, including significant price pressure on PV modules, like several other leading manufacturers in the solar industry, REC has had to implement some organizational restructuring. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Steve O’Neil, REC’s CEO stated, “Restructuring that involves layoffs is never pleasant.  But the result of REC’s restructuring puts us on a stronger path compete and grow. REC is also investing for the future; in state-of-the-art equipment for our new block production facility in Herøya, Norway, and in upgrades to our Singapore operations.”

The company said that US$48 million in capital expenditure plans to upgrade all production at its manufacturing facility in Tuas, Singapore to its half-cut PERC cell technology, used in its ‘TwinPeak’ series modules would continue.

“REC has a long track record of continuous improvements in both cost and performance of our PV modules.  This is one more step in our journey to achieve ever higher efficiency and productivity” adds O’Neil.

Although REC is no longer a publically listed company after being acquired by Elkem Bluestar in 2015, the company had provided regular quarterly business updates until the first quarter of 2016. 

According to PV Tech’s analysis of reported job losses, upstream manufacturing supply chain job losses reached around 1,314 in September, 2016, up from around 1,000 job losses announced in August. 

REC’s job losses were announced internally near the end of September. 

8 October 2024
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 8-9 October 2024 is our second PV CellTech conference dedicated to the U.S. manufacturing sector. The event in 2023 was a sell out success and 2024 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.
26 November 2024
Málaga, Spain
Understanding PV module supply to the European market in 2025. PV ModuleTech Europe 2024 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of module supplier selection; product availability, technology offerings, traceability of supply-chain, factory auditing, module testing and reliability, and company bankability.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Sydney, Australia