Netherlands

Country/Tariff Roof-Top Ground-Based BIPV Term
Netherlands

0.6kW-15kW = 0.383

15kW-100kW = 0.353

0.6kW-15kW = 0.383

15kW-100kW = 0.353

15 years

The Netherlands has a current FiT rate ranging from €353 - 383/kWh and is working towards improving renewable energy source uptake, similarly to its surrounding European countries.Under the MEP scheme, Dutch producers of renewable electricity feeding into the public grid receive a fixed fee /kWh for a guaranteed period of ten years.

The 'MEP-premium' was later abolished in 2006 when the previous Minister for Economic Affairs judged that the EU-approved target for the Netherlands of 9% renewable power consumed by 2010 would be met. Since then, investments in new renewable energy installations have fallen down to practically zero.

It wasn't until 2007 that the Dutch government published a new regulation for a feed-in premium for renewable energy. The new support mechanism, called SDE ('Stimuleringsregeling duurzame energieproductie'), which stands for "Renewable Energy Incentive" resembles the old MEP premium system.

Producers will get a premium covering extra costs on top of the wholesale energy price for a number of years. The premium will be provided to the generator of green power for maximum ten years. The level of the premium and the duration of support will vary with each technology. However, the premiums will also vary with the wholesale price of electricity.

For the new SDE regulation (Subsidies Duurzame Energie), which stands for "Renewable Energy Grants", a fund of €300 to €350 million per year will be available by 2011. In contrast to the old scheme, the new one comprises an upper limit. In the first year, the premiums will be distributed on a 'first come, first go' basis.

Source: European Renewable Energy Council

In 2007 the Dutch environment minister presented a working program known as "New Energy for the Climate." This program aims for higher levels of energy efficiency and a yearly improvement of up to 20% by the year 2020.

Later, in 2003 the premium tariff was introduced; this was labeled the MEP premium, which stands for the premium on top of the market price for power. This rate will be fixed for a period of 10 years.

Post a Comment

Post

Newsletter

Preview Latest Subscribe
We won't share your details - promise!

Publications

  • Photovoltaics International 16th Edition

    Photovoltaics International 16th Edition

    This sixteenth edition of Photovoltaics International marks four years of production of the quarterly journal. As always, our focus is on efficiency and quality improvement and cost reduction in manufacturing. As 2012 rolls along, companies are falling by the wayside due to supply and demand issues, ASP declines and drastic governmental subsidy cuts. A clear picture of 2012 is offered through papers from the likes of TÜV Rheinland, Fraunhofer ISE, SEMI PV Group and EPIA, amongst others.

  • Photovoltaics International Lite, Volume 05 - 2011

    Photovoltaics International Lite, Volume 05 - 2011

    This digital interactive Lite sees Tom Cheyney follow Agua Caliente’s progress on becoming one of first truly utility-scale PV power farms, where 40–50MW (AC) will be commissioned by the end of the year. We also feature one of the world’s largest silicon thin-film PV power plants, Avenal; a report on warnings of the collapse of module prices from Solarbuzz and PI-Berlin presents tips on PV module testing. A print version of this edition will be distributed at Solar Power International 2011 in Dallas, Texas.

  • Manufacturing The Solar Future: The 2012 Production Annual

    Manufacturing The Solar Future: The 2012 Production Annual

    Manufacturing the Solar Future 2012, the second in the Photovoltaics International PV Production Annual series, delivers the next installment of in-depth technical manufacturing information on PV production processes.

Partners

Acknowledgements

Solar Media