centrotherm hit by €11 million claim for damages after losing arbitration case

Facebook
Twitter
LinkedIn
Reddit
Email

Specialist solar PV equipment supplier centrotherm has warned that it is unlikely to be profitable in 2017, due to the loss of an arbitration case against a cancelled €290 million integrated (wafer/cell/module) plant in Algeria. 

Back in June 2014, centrotherm announced a previously planned integrated production facility for energy producer, CEEG, a subsidiary of Algerian state utility Société Nationale de L'Electricité et du Gaz (Sonelgaz) had cancelled the project, which centrotherm and facilities engineering firm, Kinetics Germany had won the contract to build. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The project suppliers sued CEEG and the case was recently heard at the International Court of Arbitration (ICC) in Geneva that led to total claims for damages from CEEG, including arbitration and legal costs of approximately €11 million.

According to centrotherm’s 2016 annual report, the company allocated around €3.1 million to the possible negative outcome of the arbitration. 

centrotherm noted in its profit warning that it was evaluating the financial impact of the CEEG award.

8 October 2024
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 8-9 October 2024 is our second PV CellTech conference dedicated to the U.S. manufacturing sector. The event in 2023 was a sell out success and 2024 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.
26 November 2024
Málaga, Spain
Understanding PV module supply to the European market in 2025. PV ModuleTech Europe 2024 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of module supplier selection; product availability, technology offerings, traceability of supply-chain, factory auditing, module testing and reliability, and company bankability.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
April 10, 2024
Dallas, Texas USA
Solar Media Events
April 17, 2024
Lisbon, Portugal
Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Napa, USA