DNV GL conducts install time test on SunPower’s ‘Helix’ roofing system

Facebook
Twitter
LinkedIn
Reddit
Email
SunPower said that its recently launched ‘Helix’ Roof product was able to be installed by at least two and a half times faster than competing commercial rooftop systems, after DNV GL undertook a ‘Mounting System Installation Efficiency Test’ in December, 2015.

Major PV energy provider SunPower has said its recently launched ‘Helix’ Roof product was able to be installed by at least two and a half times faster than competing commercial rooftop systems, after DNV GL undertook a ‘Mounting System Installation Efficiency Test’ in December, 2015.

SunPower said that the test proved that its commercial rooftop product could be installed at more than 33 modules per installer hour, compared to other publicly reported maximum install speeds of 12 to 13 panels per installer hour.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“The SunPower Helix Roof product delivers value through innovation, benefiting our commercial customers with an exclusive combination of the most efficient solar panels installed at world record speed,” said Howard Wenger, SunPower president, business units. “For businesses and organisations choosing SunPower Helix systems, installation time that is two and a half times faster means less business disruption and the opportunity to fast track cost savings and sustainability goals.”

DNV GL was said to have conducted tests on a 21.6-kilowatt (DC) rooftop system composed of 66 modules, using a three-person team that was noted for having had no previous experience installing SunPower’s Helix system.

26 November 2024
Málaga, Spain
Understanding PV module supply to the European market in 2025. PV ModuleTech Europe 2024 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of module supplier selection; product availability, technology offerings, traceability of supply-chain, factory auditing, module testing and reliability, and company bankability.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Sydney, Australia