Southern Power to acquire 100MW Boulder Solar I project from SunPower

Facebook
Twitter
LinkedIn
Reddit
Email
The 100MW Boulder Solar I Facility is expected to reach commercial operation in December 2016. Image: SunPower

Southern Company subsidiary Southern Power has acquired the controlling interest in the 100MW Boulder Solar I Facility in Nevada from SunPower, which will own the remaining interest in the project.

Southern Power president and CEO Buzz Miller noted: “Our recent acquisition of the Boulder Solar I Facility underscores Southern Power's growing success in acquiring and developing utility-scale solar across the United States. This project aligns with our business model as we strategically develop our renewable portfolio.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The Boulder Solar I Facility is located in Clark County, approximately 20 miles southeast of Las Vegas. Southern Power co-owns two other solar facilities in Nevada — the 20MW Apex Solar Facility and the 30MW Spectrum Solar Facility.   

Ty Daul, SunPower senior vice president, Americas Power Plants, noted: “With over 30 years' experience and more than 2.6GW of innovative solar power plants operating around the world, SunPower is a global leader driving the adoption of reliable, cost-effective solar power at utility scale. We are proud to partner with Southern Power to deliver long-term value to Nevada customers through the Boulder Solar I Facility.”

Construction of the project began in January 2016 and the facility is expected to begin commercial operation in December 2016.  SunPower developed, designed and constructed the plant, and will operate and maintain it once it is completed.

NV Energy will purchase the electricity and associated portfolio energy credits produced by the installation under a 20-year power purchase agreement. 

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
March 19, 2024
Texas, USA
Solar Media Events
March 26, 2024
Lisbon, Portugal
Solar Media Events
April 10, 2024
Dallas, Texas USA