Status: Completed

Size: 11kW

AEG Power Solutions has completed its first ecopx hybrid power station on New Caledonia. The company signed a contract with the Office des Postes & Telecommunications (OPT) for the delivery of the renewable energy power system last year. The New Caledonia site uses the ecopx hybrid power solution, which in this installation combines 11kW of solar energy, 5kW of energy form wind turbines and two sets of 3000Ah batteries. The site also has a diesel genset as a backup.

Site Size: undisclosed

Equipment: undisclosed

Cost: undisclosed

Construction Timetable: - June 2011