Status: Completed

Size: 200kW

Parity Solar has installed a built-in photovoltaics (BIPV) system at the New Area Court House complex in the southwestern Chinese city of Zhenjiang. The crystalline and thin-film modules are being installed over the skylight on the complex’s roof and will have a power generation capacity of 200kW. The rooftop array was connected to the grid in December 2010 – meeting the deadline for Jiangsu’s 2010 feed-in tariff of 3.0 RMB per kWh – and is fitted with Satcon Solstice inverter technology.

Site Size: undisclosed

Equipment: Satcon Solstice inverter technology, crystalline and thin-film modules

Cost: undisclosed

Construction Timetable: - December 2010

Comments