India’s large-scale solar-plus-storage tender held up by record low PV prices

Facebook
Twitter
LinkedIn
Reddit
Email
Solar prices have crashed since the tender was first released. Image Credit: Flickr. Pranav

India’s first grid-scale solar-plus-storage tender has been held up by the extreme drop in the country’s solar PV prices this year, according to Rahul Walawalkar, executive director of the Indian Energy Storage Alliance.

Although not officially announced by Solar Energy Corporation of India (SECI), which released the tender, the process has clearly faced delay after attracting strong levels of interest from 13 bidders in late 2016.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

However, Walawalkar told PV Tech that since the release, “solar prices have crashed” down to INR2.44/kWh (US$0.038/kWh). This has introduced various financial issues with the solar-plus-storage tender, and SECI is still working out how to address this.

See the full story on PV Tech's sister site Energy-Storage.News.

Read Next

Premium
July 21, 2026
'Home market strength plus Middle Eastern demand' has driven a surge in solar PV capacity in India, according to RenewAtlas and Wiki-Solar.
July 20, 2026
The US Department of Commerce (DOC) has begun an antidumping and countervailing duty (AD/CVD) investigation into solar cells produced in Ethiopia.
July 20, 2026
India's renewable energy ministry has extended the exemption from the ALMM List-II on PV cells for net-metering and open-access solar projects until the end of December 2026.
July 16, 2026
Alpex Solar expects commercial production to begin in August 2026 at its 2.2 GW TOPCon G12R solar cell facility in Kosi Kotwan, Mathura, UP.
July 15, 2026
Bluebird Solar has secured a 439.35 MW order from Indian state-owned power producer NTPC Renewable Energy Limited (NTPC REL).
July 15, 2026
CERC issues suo motu order to release interstate transmission connectivity reserved for renewable projects that failed to secure PPAs.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
April 20, 2027
Istanbul, Türkiye