India’s McNally Bharat Engineering bags 500MW EPC order in Andhra Pradesh

March 15, 2017
Facebook
Twitter
LinkedIn
Reddit
Email
The order is valued at INR4.15 billion (US$ 63.3 million). Flickr: Pranav

Kolkata-based engineering firm McNally Bharat Engineering has received an order to perform EPC and O&M services for 500MW of grid-connected solar PV projects in the Indian state of Andhra Pradesh, according to a Bombay Stock Exchange filing.

The company will also carry out design, engineering, manufacturing, supply and commissioning on behalf of the utility Andhra Pradesh Power Generation Corporation Limited.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The order is valued at INR4.15 billion (US$63.3 million).

McNally, which is part of the Williamson Magor Group, provides engineering solutions across a range of power and metal industries among others, having set up more than 350 plants since 1961.

Read Next

Premium
February 26, 2026
Analysis: As new duties threaten to block PV producers from India, Laos and Indonesia from the US market, the outcome of the Section 232 polysilicon investigation could put an end to the question of who will be next.
February 26, 2026
Indian solar manufacturer Premier Energies has unveiled a new zero busbar (0BB) TOPCon solar cell, a “first” in India, according to the company.
February 25, 2026
The US Department of Commerce (DoC) has proposed a 125.87% preliminary countervailing duty (CVD) on Indian solar cells.
February 23, 2026
Karnataka, Delhi, and Andhra Pradesh top decarbonisation, power ecosystem readiness, and market enablers, respectively, according to a joint report by IEEFA and Ember.
February 20, 2026
NTPC has commissioned 165MW of solar capacity at its 1.25GW Khavda-II solar project in Gujarat.
February 19, 2026
SolarPower Europe has released two new technical due diligence reports for utility-scale hybrid solar PV and battery energy storage system (BESS) projects.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain