ABB installs solar-storage microgrid in Gujarat

Facebook
Twitter
LinkedIn
Reddit
Email
The manufacturing hub is the company’s largest facility in India, with over 3,000 employees. Credit: ABB

Technology provider ABB has inaugurated a microgrid solution at its Vadodora manufacturing facility in Gujarat, India.

The microgrid is said to be the first of its kind to be installed at a manufacturing campus in India using both solar PV and battery energy storage. The technology combination will support the factory’s productivity and enable green power supplies in the evening hours or during cloudy periods during the day.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The manufacturing hub is the company’s largest facility in India, with over 3,000 employees, producing transformers, high voltage products, distribution relays, motors, generators and turbochargers for a variety of national projects and beyond.

ABB’s Ability control and automation system, will serve the microgrid and ensure the optimal use of the renewable energy. A cloud-based remote service system will be deployed for the operations and maintenance of the microgrid.

“Reliable, resilient and cost-effective power supply through microgrids is key to achieve Make in India targets, speed up industrial development and realize the vision of 24×7 power for all,” said Sanjeev Sharma, managing director, ABB India. “At a time when renewable energy, electric propulsion and digital technologies are disrupting the market, we are proud to partner our nation's Skill India program through ABB PowerTEC to train the workforce of the future.”

Read Next

November 3, 2026
Indian solar manufacturer Rayzon Solar has said its 5.1GW TOPCon solar cell manufacturing facility remains on schedule.
November 3, 2026
RenewSys India has signed a 1.2GW supply agreement with Kosol Energie for polyolefin elastomer (POE) encapsulants and backsheets.
November 2, 2026
Avaada Electro has secured ALMM enlistment for 7.1GW of n-type TOPCon solar cell manufacturing capacity from India's energy ministry.
November 2, 2026
Engie has commissioned two solar projects in India, the 250MW Khaba project in Rajasthan and the 200MW Khavda project in Gujarat.
October 26, 2026
Vikram Solar is on track to begin production of the first cells at its n-type TOPCon solar cell manufacturing facility in Tamil Nadu.
October 20, 2026
JMK has released a report on curtailment of renewable energy in India, showing that solar PV curtailment reached 96.9GW in September.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye