Powerway undertakes PV mounting system wind tunnel testing in Germany

Facebook
Twitter
LinkedIn
Reddit
Email

Major PV mounting systems specialist, Powerway Renewable Energy has recently undertaken extensive wind tunnel testing of its PV mounting systems in an effort to be able to reduce ballast and costs where possible.

“Mounting system design is highly important for PV systems,” said Benson Wu, Powerway’s CEO. “Based on data from extensive wind tunnel testing, mounting structures can be designed to be much more reliable by precisely measuring pressure and load on the mounting system under different conditions. In addition, the testing makes the systems less costly, because the data shows how to minimize the necessary ballast weight according to each situation.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Powerway undertook the wind testing at the wind engineering laboratories of Ruscheweyh Consult GmbH, in Würselen, Germany.

Read Next

Premium
September 4, 2026
India’s Energy Stack aims to strengthen digital infrastructure, enabling India to manage a decentralised electricity system amid rapid renewable growth.
September 4, 2026
Inox Solar Americas has signed a 767MW module supply agreement with a US renewable energy developer and independent power producer.
September 4, 2026
Germany and the wider EU can use its research and development strengths to stay competitive in the global solar PV manufacturing industry, according to a group of industry and research bodies.
September 4, 2026
PV deployment in Africa is booming, but not showing up in official statistics, new analysis by Ember and African Tech Futures Lab reveals
September 4, 2026
India's CEA has proposed mandatory grid-forming inverters and co-located energy storage for new renewable energy projects from July 2027.
September 4, 2026
News of two utility-scale solar PV developments in Texas, where construction began on a 347MW project in Wharton County and finances secured for a 310MW/250MWh pair of projects.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK