LONGi has launched its solar-plus-storage strategy, LONGi One, marking a shift from traditional multi-vendor system architectures to a fully integrated design approach.
In its analysis, Ember examined grid capacity across 20 EU countries and found the major gap was at the transmission level, with a possible shortfall of 104 GW that would affect utility-scale solar projects.