SECI tenders 70MW solar project in Assam

Facebook
Twitter
LinkedIn
Reddit
Email
The capacity will be tendered on behalf Assam Power Generation Corporation Limited (APCGL). Credit: SECI

Solar Energy Corporation of India (SECI) has issued a request for selection (RfP) for a 70MW solar project in Assam, an Indian state that has seen little large-scale PV action to date.

The capacity will be tendered on behalf Assam Power Generation Corporation Limited (APCGL) and will be located at the Amguri Solar Park, Sivasagar District on a Build Own Operate (BOO) basis.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

SECI will sign a 25-year power purchase agreement (PPA) with the successful bidder with a maximum tariff INR3.43/kWh (US$0.054).

Last month, The Assam Power Distribution Company Limited (APDCL) also tendered for 100MW (4x25MW) of grid-connected PV projects.

22 October 2026
India Expo Mart, Greater Noida
Whether you're looking for new technologies, trusted partners, or fresh business opportunities, you'll find them at the 19th Renewable Energy India Expo 2026. Join 55,000+ industry professionals and 1,000+ exhibiting brands across 14 halls featuring solar, bioenergy, battery storage, and the Germany Pavilion. It's where the clean energy sector comes together to exchange ideas, build partnerships, and drive business forward.

Read Next

September 7, 2026
SECI has launched a tender for 700MW of ISTS-connected solar PV projects to supply C&I consumers in Odisha.
Premium
September 7, 2026
As a platform designed to map full industrial ecosystems, MAPPES.io is helping identify gaps and bottlenecks in PV manufacturing hotspots such as the US and India, explains its CEO, Ankit Singhal.
Premium
September 4, 2026
India’s Energy Stack aims to strengthen digital infrastructure, enabling India to manage a decentralised electricity system amid rapid renewable growth.
September 4, 2026
India's CEA has proposed mandatory grid-forming inverters and co-located energy storage for new renewable energy projects from July 2027.
September 2, 2026
Waaree Energies approved US$37 million to expand its Arizona module plant to 1.6GW and consolidate 2.11GW in Gujarat.
September 2, 2026
India’s solar module capacity has reached 233GW, with factories operating at 35–40% utilisation amid rising overcapacity.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK