Silverback Solar increases racking system warranty to 20 years

September 22, 2011
Facebook
Twitter
LinkedIn
Reddit
Email

Solar racking and mounting system supplier Silverback Solar has extended its engineered racking system warranty to 20 years. Although the previous warranty duration was not specified, the company has made the decision following 10 years’ real-life testing of the systems’ impervious coatings on the attachment and connector equipment, as well as Allied Tube and Conduit’s Gatorshield steel tubing, which is an integral part of Silverback’s mounting systems.

The warranty extension has been added at no additional cost to customers. Silverback has to date installed over 35,000 of its patented systems globally.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

March 9, 2026
Spanish independent power producer (IPP) Zelestra has secured a US$176 million green financing package for its 242MWdc Babilonia solar project in Peru. 
March 9, 2026
The latest domestic solar-grade polysilicon transaction prices from the Silicon Industry Branch of the China Nonferrous Metals Industry Association show that all domestic n-type solar-grade polysilicon products have plunged, with steep declines across the board.
March 9, 2026
Swedish thin-film solar manufacturer Midsummer has received a follow-up machinery order worth SEK236 million (US$25.5 million).
March 9, 2026
Renewable energy platform Lyra Energy has reached financial close on its 255MW solar PV project in Thakadu, South Africa.
March 9, 2026
Clean energy advocates have applauded new measures to expand solar and storage capacity in New Jersey and tackle rising energy bills, including a 3GW boost to the state’s community energy programme.
March 9, 2026
Hanwha Qcells has resumed normal production at its solar module assembly plants in the US state of Georgia after some of its products were detained by US customs.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain