Tata Steel and Dyesol move to pre-industrial phase with dye solar cell coated steel sheeting

March 30, 2011
Facebook
Twitter
LinkedIn
Reddit
Email

Apparent success with the R&D stage of the joint development project between Tata Steel and Dyesol to commercialise dye solar cells onto steel sheeting is said to be moving to a pre-industrial phase. The £11m project, which received a £5 million technology grant from the Welsh Assembly in Wales, is due to be completed in June 2011.

“This expansion takes the project from its laboratory and pilot line phase into a pre-industrialisation phase,” commented Peter Strikwerda, Managing Director of Tata Steel Colors. “We will significantly accelerate technical progress with the objective of establishing a product, process and supply chain that can be successfully commercialised.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

Premium
January 30, 2026
In an interview with PV Tech Premium, two UNSW researchers emphasise the need for enhanced UV testing for TOPCon solar cells.
January 29, 2026
Canadian renewables firm Westbridge Renewable Energy has received approval from the Alberta Utilities Commission (AUC) to build an up to 225MW solar-plus-storage plant in Alberta, Canada.
January 29, 2026
Enfinity has started commercial operations at a 33.8MW solar PV project, the first in a portfolio from which Microsoft will acquire power
January 29, 2026
The cost of Chinese solar module manufacturing will rise in the first half of 2026, though prices may fall again before the end of the year.
January 29, 2026
PV module defects are increasing as manufacturers struggle to achieve consistent quality through robust bill-of-material and process controls.
January 29, 2026
A Korean-led consortium including Hyundai Engineering has started construction at a 350MW solar PV plant in Dallas, Texas.

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Upcoming Webinars
February 18, 2026
9am PST / 5pm GMT
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA