Horad to supply Xinneng Solar with 500MW automated turnkey module line

January 27, 2016
Facebook
Twitter
LinkedIn
Reddit
Email
Horad recently secured a 200MW turnkey module assembly line order with major Taiwanese cell producer, Motech Industries.

China-based module assembly automation specialist Suzhou Horad New Energy Equipment Co (Horad) has secured a new 500MW automated turnkey module line order from Xinneng Solar. 

Xinneng Solar was said to be located in Zhejiang Province, China. Further details were not disclosed. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Horad recently secured a 200MW turnkey module assembly line order with major Taiwanese cell producer, Motech Industries.

Read Next

Premium
December 18, 2025
PV Talk: Paul Gebhardt of Fraunhofer ISE discusses reliability issues facing advanced PV modules, an issue which isn't going anywhere.
December 17, 2025
JA Solar is a lead partner in a joint venture that broke ground this week on a new 2GW solar PV cell, 2GW module and 1GWh energy storage manufacturing facility in Egypt.
December 12, 2025
India’s flagship solar PV manufacturing incentive has driven “robust growth” in the sector since its launch, but hurdles remain to building a complete domestic supply chain.
Premium
December 11, 2025
Slowing solar PV and energy storage installations in Europe risks “competitiveness and security at a pivotal moment”, according to the head of SolarPower Europe.
December 9, 2025
Indian solar PV manufacturer Waaree Energies has signed a 288MWp solar module supply deal with US project developer Sabanci Renewables.
December 8, 2025
Proper training and adherence to best field practices are necessary to halt the steady trend of PV connector failures resulting from poor workmanship, write Brian Mills and Grayson Maurer.

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
November 24, 2026
Warsaw, Poland