India’s 2.5GW hybrid renewables tender plan the ‘right step’

May 30, 2018
Facebook
Twitter
LinkedIn
Reddit
Email
Bridge to India has said  large specific hybrid tenders are the best way to develop this market. Credit: Solar Media

The sanctioning of a tendering scheme for 2.5GW of hybrid wind and solar capacity in India, to be allocated through a transparent bidding process, has been branded as “the right step”, by consultancy firm Bridge to India.

Once the Ministry of New and Renewable Energy (MNRE) had released its finalised ‘National Wind-Solar Hybrid Policy’ earlier this month, Bridge to India had said it completely lacked a framework for converting existing wind or solar plants into hybrids and the only real opportunity would lie in new specific procurements by government agencies.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Thus, the government’s subsequent appointment of Solar Energy Corporation of India (SECI) as the nodal agency to implement a 2.5GW tender scheme has been welcomed.

Vinay Rustagi, managing director of Bridge to India, told PV tech: “We don’t expect existing wind or solar projects will find a viable means of switching over to hybrid technologies because that is going to be on a very opportunistic basis. But if the government brings out these large specific hybrid tenders, that is the best way to develop this market.”

The projects are to be connected to the Interstate Transmission System (ISTS), adding to the 7GW of ISTS tenders already out from SECI and state-run utility NTPC. Moreover, SECI this week also released a 5GW PV manufacturing RfS, which also seeks to tie the factory allocations with another 10GW of solar projects connected to the ISTS.

Bids for hybrid capacity will be for a minimum of 200MW capacity and a maximum of 500MW, with each individual project at least 50MW in size, set up on a build, own and operate (BOO) basis. Meanwhile, developers will be allowed to install any energy storage facility to help power output from these hybrid projects.

However, Rustagi added a caveat to the hybrid tender plan: “The challenge in our view is again going to be, is that really going to lead to any substantial savings over solar only or wind only tenders? My personal view is that the savings which have been touted are far too high.

“I think the savings will be much less, so once a few such tenders are out and we can see some concrete evidence in terms of tariffs and interest in the market, that will give us a much better sense of the future direction of the market, but this is the right step by issuing specific hybrid tenders in our view.”

Bridge to India has also previously described the well-touted grid stability advantages offered by hybrid projects as “debatable”, noting that there are other easier and cheaper ways to achieve the same result including better forecasting techniques, ancillary services market, and demand-side management.

An RfS will be released within the next two weeks and SECI will sign PPA’s for 25 years with successful project bidders.

PV Tech recently attended the inauguration of Hero Future Energies major hybrid wind and solar plant in Karnataka, the first in India. All the power generated will be sold to private customers.

Read Next

November 26, 2025
Indian solar PV manufacturer Vikram Solar has started commercial operations at its 5GW Vallam module manufacturing facility in India.
November 26, 2025
India has added 11GW of solar PV capacity during the third quarter of 2025, according to a report from the Institute for Energy Economics and Financial Analysis (IEEFA).
November 25, 2025
ACME Platinum has signed a PPA with the Solar Energy Corporation of India (SECI) for a 200MW solar-plus storage project in India.
November 24, 2025
India’s Railway Energy Management Company (REMC) has awarded 1GW of contracts to supply the railway network with round-the-clock (RTC) renewable energy.
November 21, 2025
ib vogt has entered a strategic partnership with Ingka Investments for a 210MW solar project in Rajasthan, India.
November 19, 2025
PVV Infra has outlined plans to build a 1GW TOPCon solar cell production line in the Indian state of Andhra Pradesh.

Upcoming Events

Solar Media Events
December 2, 2025
Málaga, Spain
Upcoming Webinars
December 4, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy