Fishery PV Plant: Largest Grid-Parity PV Project in East China

By Huawei
Facebook
Twitter
LinkedIn
Reddit
Email

In late 2019, a 260 MW fishery PV plant was successfully grid-connected in Dangtu County, Ma'anshan City, Anhui Province. The China General Nuclear Power Corporation (CGN) has already achieved breakthroughs in its operating installed capacity, reaching over 20 million kW, and this project marks a new phase in the company's high-quality  large-scale development.

The CGN Dangtu project was one of the first grid-parity PV projects approved by the National Development and Reform Commission (NDRC) in 2019 and, of the first batch of PV demonstration projects in Anhui, it is the only one to have been fully implemented, making it the largest in Eastern China. Covering approximately 4,000,000 m2 of water, the project has exclusively adopted Huawei’s FusionSolar Smart PV Solution, with on-grid tariffs amounting to approximately 5.4 cents per kWh and capacity equalling 260 MWp. 

Fishery PV plants face the following construction and maintenance challenges:

  • It is difficult to pile and route cables for water-based operations.
  • High temperature and humidity aggravate the potential induced degradation (PID) effect.
  • In vast waters, O&M is time-consuming and costly.
  • In terms of eco-friendliness, there are high requirements for fishery-solar integrations.

To overcome these challenges, the project adopted the Huawei Smart PV Solution, which integrates cutting-edge intelligent technologies, such as Smart I-V Curve Diagnosis, MBUS communication and patented PID prevention. This solution is highly beneficial in terms of high energy yields, high reliability and low O&M costs.

 

Five Technologies: The Fishery PV Plant's Foundation

1. Multiple MPPTs Ensure High Energy Yields

The project utilizes Huawei SUN2000 smart inverters, configuring each megawatt with 80 maximum power point trackers (MPPTs). This minimizes the impact of PV module mismatch caused by factors such as shading and inappropriate direction and improves  system efficiency, ensuring high energy yields. As of now, the fishery PV plant's energy yield has increased by more than 3%.

2. MBUS Communication Ensures Reliable Transmission

Water-based operations, which present high technical requirements and are difficult to implement, must be established during the construction of fishery PV plants. When you take into account the large scale of this project (88,866 pipe piles), it becomes apparent that the traditional communication solution cannot meet requirements due to extended construction periods and poor transmission reliability.

To overcome these challenges, Huawei has applied the all-new MBUS broadband power line communication technology, reducing investment and O&M costs of RS485 cabling. Signals can now be directly transmitted over power lines, with a higher transmission rate of 115 kbit/s, stronger interference immunity and higher transmission reliability.

3. Patented Anti-PID Technology Ensures Safety During Power Generation

Damp environments with high temperatures have severe PID effects. This is because  water vapour tends to accumulate on water surfaces, eroding PV modules and causing energy yield losses. To mitigate this effect, Huawei's latest PID suppression technology utilizes proprietary technologies to build a virtual neutral point through solar inverter circuits. Compared with traditional solutions that use resistors or inductors to build the neutral point, Huawei's PID suppression technology represents a major upgrade, as it reduces compensation losses and ensures safety throughout the process. As a result, energy yield increases by more than 2%, while supporting a larger array of more than 5 MW.

4. Smart I-V Curve Diagnosis Ensures O&M Efficiency

Traditional PV plant inspections are both time-consuming and inefficient. In addition, errors are bound to occur during manual sampling, especially for water-based inspections. The AI-powered Smart I-V Curve Diagnosis can remotely detect all PV modules in the entire PV plant. It is certified by TÜV that 14 types of PV module faults can be accurately identified with automatically generated reports. For a 100 MW PV plant, PV string faults can be scanned within 15 minutes, eliminating the need for site visits and boosting O&M efficiency. Clearly, this technology is capable of solving pain points in complex scenarios, such as fishery applications.

5. Integrated Convergence for Ecosystem Friendliness

To ensure water quality and protect aquatic animals, monitoring sensors and controllers need to be connected to PV plants. These devices can be connected to the nearest smart PV transmission channel to save cable and labour costs, ensuring data transmission stability and device control. In addition, with AI Boost Suite and Smart I-V Curve Diagnosis, which integrate fishery and PV management modules, the management process has become significantly more simple and efficient.

As the largest grid-parity PV project in Eastern China, the CGN Dangtu plant serves as a model for integrating smart PV and fishery. CGN is committed to ensuring this project becomes a benchmark for ecological PV plants in China, thus promoting the comprehensive development of ecological fishery and the creation of an eco-friendly world.

Subscribe to Newsletter

Upcoming Events

Solar Media Events, Upcoming Webinars
December 12, 2024
9am GMT / 10am CET
Solar Media Events
February 4, 2025
London, UK
Solar Media Events
February 17, 2025
London, UK
Solar Media Events
February 26, 2025
Seattle, USA