Back to basics: GE suspends CdTe thin-film production plans

July 4, 2012
Facebook
Twitter
LinkedIn
Reddit
Email

Several reports cite General Electric’s general manger of solar technology operations, Danielle Merfeld, saying that the company has suspended the construction and commercial roll-out of its CdTe thin-film modules due to the current market conditions. GE announced the location of its first thin-film plant in October 2011 which would have a nameplate capacity of 400MW and start commercial shipments in 2013. The facility was at the core of a US$600 million investment in entering the solar industry.

As revealed by Ucilia Wang, writing for Gigaom, GE has reduced its solar headcount and gone back to the lab to boost cell efficiencies and lower production costs. The plan is to achieve conversion rates of 15% or more before planning to return to production ramp plans sometime in 2014.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

GE is potentially following the same course as rival Abound Solar, which also initially stopped pilot production of CdTe-based modules to focus on next generation high efficiency modules before re-entering the market.

However, Abound filed for bankruptcy a few months later. In the case of GE it could be a long-time before the company could guarantee it had a viable commercial product due to the continued pricing pressure and continued efficiency gains of crystalline silicon technology. 

Read Next

April 2, 2026
Solar manufacturer Qcells is expanding into integrated home energy systems with a new division targeting the US residential construction sector.
April 2, 2026
LONGi has launched its solar-plus-storage strategy, LONGi One, marking a shift from traditional multi-vendor system architectures to a fully integrated design approach.
April 2, 2026
Monocrystalline passivated emitter rear contact (PERC) modules saw a 20% increase in average price in the US, according to Anza.
April 2, 2026
Pan-African developer Axian Energy has reached financial close on what it is billing as West Africa’s largest solar-plus-storage project.
Premium
April 2, 2026
R.Power's Michał Swół speaks to PV Tech Premium about Germany's position as a leader in Europe's renewable energy auction space.
April 2, 2026
French oil and gas major TotalEnergies has signed a US$2.2 billion joint venture (JV) with the Emirati state-run renewable energy developer Masdar to jointly develop renewables across Asia.

Upcoming Events

Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland