NTPC tenders for 36MW of solar in Telangana and Gujarat

June 11, 2018
Facebook
Twitter
LinkedIn
Reddit
Email
Credit: NTPC

Indian state-run utility NTPC has issued EPC tenders for a 21MW solar project in Gujarat and a 15MW plant in Telangana.

Both projects will be awarded via a reverse auction and will require O&M services for a three-year period.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The Gujarat project will be located at Gandhar. Deadline for bid submissions is 26 July 2018.

The Telangana project will be located at Ramagundam. The deadline for bid submissions is 30 July 2018.

The utility also recently issued an invitation for bids for EPC work on three separate solar projects in Gujarat, Uttar Pradesh and Karnataka, with a combined capacity of 102MW.

Read Next

February 10, 2026
Rewa Ultra Mega Solar Limited (RUMSL) has extended a Letter of Award (LOA) to Ceigall India and ACME Solar to develop 220MW solar-plus-storage in Morena, Madhya Pradesh. 
February 3, 2026
The US and India have announced a trade deal under which Washington will cut reciprocal tariffs on Indian goods to 18% from 25%.
February 2, 2026
India’s Union Budget 2026-27 reinforces government support for renewables through duty exemptions and infrastructure spending.
January 30, 2026
India Power Corporation Limited has partnered with Bhutan’s Green Energy Power Private Limited to develop a 70MWp solar power plant in Paro, Bhutan
January 29, 2026
PV module defects are increasing as manufacturers struggle to achieve consistent quality through robust bill-of-material and process controls.
January 28, 2026
India’s power system faced growing integration challenges in 2025 as solar curtailment emerged as an early signal of insufficient grid flexibility, according to a new report from energy think tank Ember.

Upcoming Events

Upcoming Webinars
February 18, 2026
9am PST / 5pm GMT
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA