Array Technologies ships its first solar tracking system for 50MW SMUD project

Facebook
Twitter
LinkedIn
Reddit
Email

Array Technologies has shipped its first solar tracking system for the Sacramento Municipal Utility District’s (SMUD) 50MW PV installation in south Sacramento County, California. The utility-scale project is being developed by Recurrent Energy with Swinerton Renewable Energy acting as the EPC for the installation.

Array Technologies provided its horizontal, single-axis trackers and ground-mount racks for the SMUD installation, which is comprised of three different sites in the Sacramento area. The Kammerer and Bruceville sites will each have 19MW projects developed while the Dillard site will house a 12MW solar project. Array’s DuraTrack HZ tracking systems will be used at all three sites with the Dillard project additionally utilizing DuraRack fixed arrays for energy production. The project is expected to be commissioned in the spring of 2012.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Sydney, Australia
Solar Media Events
May 21, 2024
Napa, USA