ADB targets US$1 billion investment in Bangladesh’s 1GW solar-plus-storage programme

Facebook
Twitter
LinkedIn
Reddit
Email
ADB, Bangladesh expand solar and BESS programme to more than 1GW
ADB aims to mobilise more than US$1 billion in private investment to support Bangladesh’s target of meeting 20% of electricity demand from renewables by 2030 and 30% by 2040. Image: Asian Development Bank.

The Asian Development Bank (ADB) will provide transaction advisory services for five additional solar and battery storage projects in Bangladesh, expanding a programme that now covers six projects with more than 1GW of combined capacity.

The expanded programme builds on ADB’s advisory support for the 130MW Sonagazi solar PV project in Feni District, which includes a 26MWh battery energy storage system (BESS). The programme will be implemented in three phases, with Sonagazi forming the first phase and the five additional projects covered under phases two and three.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

ADB’s advisory services aim to mobilise more than US$1 billion in private sector investment and support Bangladesh’s target of generating at least 20% of its electricity from renewable sources by 2030, increasing to 30% by 2040.

The tender for the Sonagazi project is expected to be launched within 2026. As the first project under the agreement, it will establish the framework for structuring and procuring the remaining five projects.

“Bangladesh has an opportunity to build a more secure, sustainable and investment-ready energy future,” said ADB country director for Bangladesh Qingfeng Zhang.

“The expansion of ADB’s transaction advisory services mandates reflects a shared ambition to move beyond individual projects and create a scalable market for clean energy investment. By strengthening project preparation, competitive procurement, and the enabling environment for private investment, we can help mobilize the capital, technology, and expertise Bangladesh needs to power its next phase of development.”

Under the expanded mandate, ADB will support Invest Bangladesh and the Bangladesh Power Development Board (BPDB) in assessing the suitability of government-owned land for the additional projects.

The advisory mandate will cover project preparation, technical and financial assessments, market sounding, tender document preparation, and support for competitive bidding and contract awards.

A memorandum of understanding formalising the expanded partnership was signed by Mostafa Kamal, Member (Additional Secretary) of the Public–Private Partnership Division, Invest Bangladesh; Afroza Sultana, Secretary of the Bangladesh Power Development Board; and Zhang, representing ADB.

According to Bangladesh’s National Database of Renewable Energy (NDRE), managed by the Sustainable and Renewable Energy Development Authority (SREDA), the country had 1,661.32MW of installed solar capacity as of 1 November 2026, comprising 1,283.75MW of on-grid and 377.57MW of off-grid capacity. Solar accounted for around 85% of the country’s total renewable energy capacity of 1,954.42MW.

Bangladesh is targeting 5,500MW of rooftop solar capacity across approximately 870,000 rooftops by 2030, with a targeted 20:80 split between domestic and international financing.

A report published by the Institute for Energy Economics and Financial Analysis (IEEFA) in August 2026 found that rooftop solar in Bangladesh could save consumers up to US$0.061/kWh compared with grid electricity, with operational rooftop capacity estimated at 667MW.

Meanwhile, ADB has been supporting renewable energy development across Asia and the Pacific through project financing and private sector investment. In July 2026, it approved an US$850 million loan for the second phase of India’s residential rooftop solar programme, following a US$650 million loan approved last year for its first phase.

In the same month, ADB joined the World Bank Group, the Japan International Cooperation Agency (JICA) and the Canadian government in reaching financial close on Timor-Leste’s first utility-scale solar and battery storage project, comprising 73.7MW of solar PV and 80.2MWh of battery storage. It also approved a US$160 million loan to support at least 310MW of new solar capacity in Bhutan.

In May 2026, ADB signed a transaction advisory services agreement with Solomon Islands Electricity Authority to support the development of the country’s first large-scale grid-connected solar PV project in Honiara through private sector investment.

2 February 2027
London, UK
Returning in 2027 for its 14th edition, Solar & Storage Finance Europe will bring together the brightest minds representing funds, banks, developers, utilities, government and industry across Europe and the UK on a programme that is solutions-focused from top to tail. The event is designed to enable leaders at the forefront of solar and storage investment and deployment in Europe to scale, learn and land themselves industry defining partnerships.

Read Next

November 18, 2026
Solar Materials has opened its second recycling line in Magdeburg, doubling its annual processing capacity to up to 28,000 metric tons.
November 18, 2026
Australia and South Korea have signed an MoU on a bilateral decarbonisation pathway at COP31, to connect with Korean industrial demand.
November 17, 2026
Quality defects the solar industry resolved more than a decade ago are resurfacing as PV manufacturing geographies shift, according to Cherif Kedir, CEO of the Renewable Energy Test Center (RETC).
November 17, 2026
The latest edition of PV Tech Power leads with a special report that takes you behind the scenes of America’s burgeoning PV manufacturing sector.
November 17, 2026
LONGi will supply 176MW DC of its Hi-MO 9 back contact (BC) solar modules to OX2's Muswellbrook solar-plus-storage project at a former coal mine in New South Wales (NSW), Australia.
November 16, 2026
Vikram Solar secured 1.7GW in new orders in Q2 but saw both revenues and profits fall as the company faced procurement and pricing headwinds.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye