Aggreko launches solar power rental scheme

Facebook
Twitter
LinkedIn
Reddit
Email
Image: Aggreko.

Aggreko has launched a solar power rental offer, allowing companies to borrow 1MW PV solutions without a long-term commitment.

The systems are available for a minimum term of five years, keeping financial and technical commitment low, as there is no upfront CAPEX required.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

It includes Aggreko’s solar PV panels, which have a single-axis tracking system improving energy delivery by 10-20%. Aggreko Solar Power combines PV string inverters with containerised controls to improve resilience through reduced installation time.

Deployment time is around three to four months, and Aggreko says that its systems have low O&M requirements, making the system well suited for use in harsh and remote environments.

The system integrates with the company’s battery storage products and thermal generators, with intelligent software able to control the hybrid system.

“Aggreko Solar Power is designed for ease of deployment both in physical terms, thanks to relatively quick off-grid implementation, as well as financial, with no requirement of significant upfront costs,” said Karim Wazni, managing director, Aggreko Microgrid and Storage Solutions. 

“Our goal is to offer the widest and most flexible range of mobile and modular solutions, including off-grid renewable energy systems such as this one, as a plug-and-play service for short or long-term needs.”

The launch of Aggreko Solar Power comes after the successful installation of panels and a battery storage system at the Granny Smith gold mine in Western Australia. More than 23,000 panels were installed at the site, together with a 2MW/1MWh battery system, which will support Aggreko’s existing 27MW gas-fired power station at the mine.

Read Next

Premium
June 12, 2026
China, the world’s largest PV market, is poised to lead sustainable solar module recycling and circular manufacturing, writes Huan Li.
June 12, 2026
Silicon valley tech giant Meta has signed another power purchase agreement (PPA) with RWE for a solar project in Texas.
Premium
June 12, 2026
PV Talk: IEEFA’s Gaurav Upadhyay says India’s rooftop solar surged but conversion gaps and financing barriers persist despite strong momentum.
June 12, 2026
Fraunhofer ISE has increased the performance of its III-V germanium solar module from 34.2% to 34.4% using shingle-matrix technology.
June 12, 2026
Lu Chuan, chairman of CHINT and its subsidiary Astronergy, outlines his prudent approach to navigating the difficulties facing China's PV manufacturers.
June 11, 2026
The European Union has launched an investment platform to expand renewable energy, clean technology manufacturing and electricity networks across the Mediterranean region.

Upcoming Events

Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Media Partners, Solar Media Events
September 9, 2026