
Tracker firm GameChange Solar has received an order for 100MW of its Max-Span post driven racking systems from an unnamed PV developer.
The project will be installed at a location on the east coast of the US starting at the end of 2016.
This article requires Premium SubscriptionBasic (FREE) Subscription
Already a subscriber? Sign In
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
Derick Botha, vice president of business development at GameChange Solar, said: “The value pricing of our product helped to make this project feasible given tight economic requirements. The scale of manufacturing that GameChange possesses, as well as the ability of meeting the required delivery timelines for a quality product were also keys that allowed GameChange to win this significant order.”
GameChange Solar recently surpassed 1GW of sales with 1GW installations also expected by the end of this year.