UL certifies Mage Solar’s modules for PID resistance

March 12, 2012
Facebook
Twitter
LinkedIn
Reddit
Email

PV system and module supplier Mage Solar has revealed that its Powertec Plus module range was certified against potential-induced degradation (PID) by Underwriters Laboratories (UL) at the end of 2011. This test, which vouches for the modules’ insensitivity to power losses due to high voltages, temperatures and humidity, was carried out at UL’s Neu-Isenburg facility at the end of the year.

The conditions for this test are currently specified at -1,000V, 25°C and an 85% humidity. Mage’s mono- and polycrystalline modules yielded results that showed that they lost less than 5% of their nominal power under these standardized test conditions, and so they are considered to have passed the PID resistance test.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

March 6, 2026
French energy major TotalEnergies has initiated pilot operations of the first generating unit at its 1GW solar farm in Iraq’s Basra region.
March 6, 2026
US solar manufacturer Silfab Solar has disputed some reports of chemical spillages at its manufacturing facility in Fort Mill, South Carolina.
March 6, 2026
Origis Energy has secured US$545 million in financing for three utility-scale solar projects with a combined capacity of 413MW in Texas.
March 6, 2026
Spanish independent power producer (IPP) Zelestra has begun the construction of 253MWdc Echols Grove and 188MWdc Cedar Range projects in Texas.
March 6, 2026
Silfab solar has paused operations at its module manufacturing plant in South Carolina following chemical spills.
March 6, 2026
Portland General Electric (PGE) has finalised agreements for more than 1,000MW of new renewable energy and battery energy storage system (BESS) projects in the US state of Oregon.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain