First Solar sells 250MW Nevada solar project to Capital Dynamics

Facebook
Twitter
LinkedIn
Reddit
Email
The 250MW PV project can generate enough clean energy to power around 111,000 homes in Los Angeles. Image: First Solar

PV solar systems provider First Solar announced Thursday that it has completed the sale of the cash equity interests in the 250MW Moapa Southern Paiute Solar Project in Nevada to private asset manager Capital Dynamics.

Terms of the transaction were not disclosed.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Less than two weeks ago, First Solar brought the solar plant online — with the project standing as the first ever utility-scale solar installation on tribal land in the US.

The project, which is located just 30 miles north of Las Vegas, has a 25-year PPA with the Los Angeles Department of Water and Power (LADWP) and can generate enough clean energy to power around 111,000 homes in Los Angeles.

Minority tax equity interests in the project are shared by GE unit GE Energy Financial Services, along with an affiliate of the Goldman Sachs Group.

Georges Antoun, First Solar’s chief commercial officer, said: “This has been an exciting project to develop and build. Our technology is driving down the cost of solar electricity and enabling power providers to include competitive, reliable renewable energy in their portfolios. We are proud to transfer ownership of this power generation asset to Capital Dynamics.”

First Solar Energy Services will continue to operate and maintain the power plant for Capital Dynamics.

John Breckenridge, Capital Dynamics’ head of clean energy and infrastructure, said: “The Moapa project is an important step in the Clean Energy and Infrastructure strategy of Capital Dynamics. We continue to be long-term owners of high quality power generation assets in North America and Europe. We are particularly pleased that with Moapa, we expand our strong relationship with First Solar.”

Read Next

April 30, 2025
Cadmium telluride (CdTe) thin-film solar manufacturer First Solar has issued revised guidance to reflect the expected impact of the implementation of new tariffs set by Donald Trump’s administration.
March 4, 2025
Thin-film solar manufacturer First Solar has decided to reduce its module production output in Malaysia and Vietnam for a combined 1GW in 2025.
February 26, 2025
First Solar has launched a lawsuit against JinkoSolar for alleged infringement of a tunnel oxide passivated contact (TOPCon) cell patent.
February 21, 2025
The credits are Section 45X Advanced Manufacturing Production tax credits generated from selling its modules from US manufacturing bases.
January 27, 2025
Lightsource bp, the solar power development arm of oil and gas major bp, has commissioned the 187MW Peacock solar project in Texas.
January 22, 2025
The firms say their tech can “confidently” meet domestic content bonus requirements under the Inflation Reduction Act (IRA)

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia