LONGi warns of profit hit after Yunnan province rows back on power price deal

Facebook
Twitter
LinkedIn
Reddit
Email
LONGi said power prices account for about 15% of total wafering costs. Image: LONGi Solar.

LONGi Solar has warned of reduced profits after Yunnan Province, where a significant portion of its manufacturing output resides, cancelled a previously-struck power pricing agreement.

In a statement to the Shanghai Stock Exchange issued earlier today, LONGi said that it had been informed by authorities in Yunnan earlier this month that the province could no longer honour a preferential power pricing agreement struck between the two parties in 2016.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

As a result, LONGi will instead pay standard market-based prices for its power consumption, resulting in a material adverse impact on the manufacturer’s profits. LONGi noted that electricity costs account for about 15% of the total production cost of wafering.

LONGi further warned that capacity expansion projects that are still ongoing in Yunnan could be revised as a result of the power price revision.

Between 2016 and the end of 2021, LONGi has deployed around 67GW of silicon pulling capacity and 57GW of wafering capacity in Yunnan, the latter of which makes up more than half (54%) of LONGi’s total wafering capacity as of the end of last year.

In addition, several capacity expansion projects had been earmarked for Yunnan, including a 30GW cell production facility slated for construction in Qujing. These facilities have not yet started construction, and higher than expected power prices now casts doubt over these expansions.

Read Next

May 12, 2025
SEG Solar has commissioned the first phase of its newest cell manufacturing facility, in Indonesia, with a production capacity of 2GW.
May 9, 2025
LONGi has launched a new back contact (BC) module for its EcoLife series at the Intersolar Europe event in Munich, Germany.
May 9, 2025
Solar manufacturers Aiko Solar and Canadian Solar showcased their latest modules, while 7Secondsolar, LONGi Solar and Weidmüller won in the Photovoltaics (PV) category at this year's The smarter E Award. 
May 7, 2025
Four leading Chinese PV companies, JinkoSolar, LONGi Green, JA Solar and Trina Solar, recently released their financial reports for Q1 of 2025, all with a decrease in their revenue. 
April 30, 2025
Almaden has announced plans to establish a wholly-owned subsidiary in the United Arab Emirates, via its existing subsidiary Almaden (MENA).
April 28, 2025
Swiss renewable power developer Axpo and EDF Renewables Hellas have signed a power purchase agreement (PPAs) for 102MW of solar capacity.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia