Mibet has introduced G7, a floating solar mounting system that holds modules in portrait orientation instead of landscape.

On a floating array, maintenance walkways take up a sizeable share of an array’s footprint. Leaving them out between some rows saves space, but the modules in those rows become harder to reach.

Every module row in G7 still has a walkway along its front and rear edges. Even so, in a 36-module reference layout, G7 needs about 14% less water area than Mibet’s previous landscape layout, with walkways and perimeter floats counted in both.

Walkways run between module rows, so the number of walkways follows the number of rows. In a landscape layout, each module’s long side runs along the row, which limits how many modules a row of a given length can hold. In portrait, the short side runs along the row. Each row holds more modules, and the same number of modules fits into fewer rows with fewer walkways between them. On a large reservoir, that saving can mean more capacity on the same water area, or the same capacity on a smaller footprint.

In the G7 layout, the junction boxes of neighbouring modules also sit closer together, so the cable connection between them is shorter. Shorter connections use less cable and, at the same cable size, lose less power to resistance.

Mibet’s earlier floats carried two rails. The G7 main float carries three C-channel rails, and neighbouring modules share the one in the middle. Sharing it cuts down on support parts and lets the modules sit closer together.

The centre slot is deeper than the two outer slots, and the centre rail is taller by the same amount. All three rail tops are flush. The shared rail is on the float’s centreline and carries load from both neighbouring modules.

Across the array, G7 packs about 19% more float buoyancy into each square metre than the company’s previous floating system.

Each module sits on short front legs and taller rear legs, all bolted to the rails. The legs are made to the tilt specified for each project, from 3° to 15°. Clamps press the module frame down from above, and a support plate fastened to each leg holds the frame from below. A stop at the top of each leg keeps the module in place while the crew installs the clamps. No separate anti-slip parts are needed.

G7 floats and connections passed the following tests under NB/T 10187-2019, China’s energy industry standard:

  • Single-lug vertical pull test
  • Diagonal and opposite-side pull tests
  • Top-surface compression test
  • Drop and ball impact tests
  • Airtightness and watertightness tests

Bolt-and-nut assembly test

Upcoming Events

Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye