Kulachi seeking EPC services for 50MW solar project in Pakistan

October 31, 2017
Facebook
Twitter
LinkedIn
Reddit
Email
Flickr: Nicolas Raymon

Kulachi Solar Power Project (Private) Limited is tendering for EPC services on a 50MW solar PV project near Kulachi, in the Khyber Pakhtunkhwa (KP) Province of Pakistan.

This comes under the terms of a Letter of Interest (LoI) issued by the Pakhtunkhwa Energy Development Organization (PEDO). It includes engineering design, manufacturing, supply, erection, construction, testing, commissioning and O&M on a turnkey basis.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Domestic and international firms in joint ventures with a domestic partner have been invited to participate.

100MW tariff calculation

In other news, Pakistan’s National Electric Power Regulatory Authority (NEPRA) has received a tariff petition filed by Zhenfa Pakistan New Energy for a 100MW solar project at Rakh Chaubara, Punjab, Pakistan.

The project is expected to cost US$91 million and would have a proposed tariff of US$0.064242/kWh (PKR6.7455).

In September, Norwegian solar project developer Scatec Solar and Pakistani partner Nizam energy sought levelized tariffs of US$5.9574/kWh for three 50MW projects in the Sindh region of Pakistan.

Read Next

Premium
October 14, 2025
Perovskite, tariffs, Section 232 and FEOC were among the key topics discussed at PV CellTech USA this year in San Francisco.
Premium
October 13, 2025
Brett Beattie of Castillo Engineering looks at some of the key land grading work that can make multimillion-dollar differences to projects.
October 6, 2025
Rajasthan government will develop 500MW/2,000MWh of standalone battery energy storage systems (BESS) with a four-hour single-cycle configuration and extended operational life.
September 29, 2025
Burns & McDonnell examines the outlook of the utility-scale solar sector amidst the latest policy and tariff changes.
Premium
September 4, 2025
Analysis: A Biden-era policy to suspend the payment of duties on Southeast Asian module imports looks set to backfire badly on an already under-pressure US solar industry.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 10, 2026
Frankfurt, Germany
Solar Media Events
March 24, 2026
Lisbon, Portugal