Saudi Arabia adds PV rooftop systems to Financial District towers in Riyadh

January 10, 2012
Facebook
Twitter
LinkedIn
Reddit
Email

Saudi Arabia’s King Abdullah Financial District (KAFD) in Riyadh will be equipped with the city’s first solar rooftop plant using Conergy’s PV modules. The 200kW installation will be located on the roofs of towers A and C in the KAFD, reducing the city’s dependence on oil-generated electricity and bringing the city closer to its goal of becoming a recipient of the ‘LEED Gold’ certification awarded by the US Green Building Council.

Conergy will supply over 800 of its Conergy PowerPlus modules to Modern Times Technical Systems (MTTS), a locally-based engineering company, for the project. The modules will be installed on Conergy’s SunTop III mounting systems across a surface of 1,300m2, and the system's annual output of 330MWh will be connected to the city’s grid by means of 14 string inverters.
 
“The KAFD is no doubt an ecological pioneer, who we commend for playing this role,” says Alexander Lenz, Conergy president of South East Asia and the Middle East. “With its environmentally friendly architecture, the KAFD demonstrates how the Saudi financial sector can reduce its dependence on fossil fuels. With the first rooftop plant in Riyadh, the KAFD is setting an example – and simultaneously encouraging more green awareness and action in the Middle East.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

November 17, 2025
Renewable energy developer SunCable has signed an Indigenous Land Use Agreement (ILUA) with the Powell Creek Native Title Holders, marking a milestone for the company’s AAPowerLink project in Australia's Northern Territory.
November 17, 2025
Jakson Group has started Phase 1 construction of its 6GW integrated solar ingot, wafer, cell and module manufacturing facility at Maksi, Madhya Pradesh.
November 17, 2025
India’s race to 500GW is being slowed by critical grid bottlenecks, NTPC PMI’s Abhinav Jindal told PV Tech.
November 17, 2025
Saatvik Green Energy, through its subsidiary Saatvik Solar Industries, has secured solar PV module orders worth INR1.77 billion (US$19.9 million). 
November 17, 2025
US solar module manufacturer First Solar will build a new production facility in the state of South Carolina, which will bring its US nameplate manufacturing capacity to 17.7GW by 2027.
Premium
November 17, 2025
PV Talk: India’s race to 500GW of clean energy is being slowed by critical bottlenecks. NTPC PMI’s deputy general manager Abhinav Jindal tells Shreeyashi Ojha what steps India must urgently take to stay on track with its 2030 targets.

Upcoming Events

Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal
Solar Media Events
June 16, 2026
Napa, USA