Solar FlexRack signs supply deal with Swinerton for 26.4MW PV project

July 23, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
The Tobacco Valley solar project, located in Simsbury, Connecticut, will be installed with Solar FlexRack's Series G3-X fixed tilt solution. Image: SolarFlexRack

Solar FlexRack, a division of Northern States Metals and PV mounting and solar tracker solutions company, has completed a contract to supply a 26.4MW solar installation for Swinerton Renewable Energy. 

Swinerton will serve as the project's engineering, procurement, and construction company. The Tobacco Valley solar project, located in Simsbury, Connecticut, will be installed with Solar FlexRack's Series G3-X fixed tilt solution, which is known for its performance in challenging climates.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

George Hershman, general manager, Swinerton Renewable Energy, said: “Swinerton Renewable Energy is dedicated to building solar projects that provide maximum value for our clients, our partners and the community, and our suppliers are instrumental in meeting this goal. We're pleased to have a proven partner like Solar FlexRack on this project.”

Steve Daniel, executive vice president of Solar FlexRack, added: “Swinerton Renewable Energy is an employee-owned organization which maintains a high standard for the work they complete, their employees and commitment to the communities in which they work. They build responsibly and that philosophy is driven throughout their organization.”

Construction is already underway, with the Tobacco Valley solar project scheduled for completion in 2019. In total, the project is expected to generate enough energy to power 6,800 homes and create over 300 construction jobs.

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2028 and beyond.
13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our third PV CellTech conference dedicated to the U.S. manufacturing sector. The events in 2023, 2024 and 2025 were a sell out success and 2026 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.

Read Next

March 19, 2026
The California Senate Energy, Utilities and Communications Committee has unanimously voted 14-0 (and 3 abstentions) in favour of a bill for balcony solar.
March 19, 2026
US solar developer Avantus and Toyota Tsusho America (TAI) have completed construction at the 159MW Norton Solar Project in Texas.
March 19, 2026
There is “an emerging and significant compliance risk” for US solar manufacturers and buyers around the origin of solar wafers, according to new analysis from law firm Wiley Rein.
March 19, 2026
PV manufacturer Canadian Solar’s first US-made solar cells are expected to be produced by the end of March in Jeffersonville, Indiana.
March 19, 2026
Sunraycer Renewables has broken ground at a portfolio of three solar-plus-storage projects in the US state of Texas.
March 18, 2026
Origis Energy has commenced operations at its 210MWdc Wheatland utility-scale solar project in Knox County, Indiana.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain