EnergyTrend: Polysilicon supply constraints due in Q1 2014

Facebook
Twitter
LinkedIn
Reddit
Email

According to a research note from EnergyTrend, a research division of TrendForce based in Taiwan, PV demand could potentially outstrip supply by the first quarter of 2014.

TrendForce noted that with continued strong downstream PV demand into next year current production levels of polysilicon can meet around 7.2GW of module shipments per quarter.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

However, EnergyTrend estimates that demand of silicon wafers will be around 8GW or higher in the first quarter of 2014, coupled with lower polysilicon inventory levels there could be a squeeze on supply until idled capacity or new capacity built but not ramped can be brought online.

An increase in polysilicon prices is expected to be needed before producer’s ramped idled capacity to above breakeven levels, which may not necessarily coincide with the demand-side of PV modules in the first quarter of 2014.

PV demand in the first quarter is expected unusually strong due to FiT changes in Japan and the UK at the end of the quarter and financial year.

EnergyTrend is forecasting grid-connected installations are likely to reach 28.6GW in 2013, while module shipments are expected to be around 33.3GW. 

Read Next

May 9, 2025
Talk of manufacturing consolidation, excitement over energy storage and other key takeaways from Intersolar Europe 2025.
May 9, 2025
LONGi has launched a new back contact (BC) module for its EcoLife series at the Intersolar Europe event in Munich, Germany.
May 9, 2025
Scatec has announced revenues of NOK2.39 billion (US$230 million) and profits of NOK1 billion (US$96 million) in the first quarter of 2025.
Premium
May 9, 2025
BrightNight made community engagement central to its plans for a 201MW PV project in a former mining area in Kentucky.
May 9, 2025
Solar manufacturers Aiko Solar and Canadian Solar showcased their latest modules, while 7Secondsolar, LONGi Solar and Weidmüller won in the Photovoltaics (PV) category at this year's The smarter E Award. 
May 9, 2025
Continued “weak demand” from the commercial and industrial (C&I) and residential segments has negatively impacted SMA Solar’s sales and income in the first quarter of 2025.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia