Intersolar India: Auction for 4GW mega solar project to start ‘in months’

Facebook
Twitter
LinkedIn
Reddit
Email

At Intersolar India 2013, the joint secretary for the Ministry of New and Renewable Energy (MNRE), Shri Tarun Kapoor, said invitations for tenders for the 4GW mega solar project in India will begin in a few months.

Tarun Kapoor said the first 1GW phase is scheduled for completion in three years, and tenders will be invited “in the next three to four months”, The Economic Times reported from the conference yesterday.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The mega solar project’s main aim is to bring down the cost of power to nearly INR5 (US$0.078) per unit, said Kapoor. Currently solar power is around INR6 (US$0.094) per kilowatt hour for large projects in India.

Finance for the project was also mentioned as Kapoor said the project would be gaining “viability gap funding” for up to INR1,000 crore (US$157 million) under the second round of the country's national solar programme.

The Solar Energy Corporation will be the “sole authority” selling the solar power generated from the mega project, with the entire 4GW project expected to be completed in seven years, Kapoor reportedly said.

The initial phase is to be developed at Sambhar Lake on more than 7,284 hectares of land from Hindustan Salts. The entire project's cost is estimated at INR30,000 crore (US$4.7 billion), the equivalent of INR7.5 crore per megawatt (US$1.2 million), said Tarun Kapoor. When fully completed, the 4GW project will produce 6,000 million kWh per year to supply the country with energy through the national grid.

The first 1GW phase was announced in September, and is being undertaken by a joint venture between electrical equipment manufacturers, Bharat Heavy Electricals Limited (BHEL), Rajasthan Electronics and Instruments Limited (REIL) and SSL, the Solar Energy Corporation of India, the Power Grid Corporation of India and the government run hydro-electric power plant developer, SJVN. The joint venture plans to issue the remaining 3GW of tenders in 500MW blocks.

According to Intersolar’s website, Tarun Kapoor also said with the second phase of the national solar mission underway, the Indian PV market will “grow even more rapidly in the future,” continuing that India has an installed photovoltaic capacity of 1.1GW, and intends to increase this “nine-fold” to 10GW by 2017.

Read Next

May 21, 2026
Indian renewable energy company SAEL has commissioned 600MW of solar project in Amaravati, Andhra Pradesh. 
May 21, 2026
US solar glass producer Stewart Glass is expanding its facility in Ohio with a new production line expected in 2027.
May 21, 2026
Spanish independent power producer Grenergy has signed a long-term hybrid power purchase agreement (PPA) with US utility Georgia Power.
May 21, 2026
Developers of co-located solar-plus-storage projects need to ensure their projects are designed to ‘solve’ the challenges faced by offtakers.
May 21, 2026
Europe has avoided €10 billion in gas imports since the start of the Iran war thanks to power generated from its solar PV fleet, according to research from SolarPower Europe.
May 21, 2026
A panel at the Renewable Procurement and Revenue Summit in London discussed the benefits of the procurement structure.

Upcoming Events

Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA