SECI awards 65MW solar in Gujarat and 50MW under DCR in Karnataka

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: Mahindra

Solar Energy Corporation of India (SECI) has awarded 40MW of solar PV capacity to Renew Solar Power and 25MW to Mahindra Renewables in the state of Gujarat under open category.

The awards for 160MW of capacity in the same tender were previously made public, but now the last 65MW have been announced with Renew bidding for viability gap funding (VGF) of INR7.0198 million (US$104,700) and Mahindra once again bidding for a VGF of INR7.777 million. As usual for VGF bidding, the tariffs were fixed at INR4.43/kWh.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

In this particular batch of projects, 100% of the VGF will be dispersed to the developer on the commissioning of the plant. Meanwhile, SECI also obtains a bank guarantee for 20% of the VGF amount.

Gujarat Industries Power (80MW), Orange (40MW) and Mahindra (40MW) had already been announced as winners from this tender.

DCR in Karnataka

SECI has also awarded Indian conglomerate Adani 40MW of solar capacity and awarded Karnataka Power Corporation 10MW in the state of Karnataka, under local content rules for solar equipment.

Adani won the Domestic Content Requirement (DCR) capacity with a VGF bid of INR13.089 million and Karnataka Power put in a bid for INR13.075 million.

The capacity is part of a wider 1GW auction for the state, for which the results of the open category have already been released.

The news comes just after Bridge to India revealed that Chinese module suppliers have taken a 75% market share in India. Domestic manufacturers are expected to keep just 10-12% of the market share with Adani's 1.2GW facility to bump this figure up once online.

Read Next

August 28, 2025
Indian solar manufacturing firm INA Solar has broken ground on its fourth 4.5GW cell production plant in Narmadapuram, Madhya Pradesh.
August 26, 2025
Jakson Engineers is investing over INR80 billion (US$912.5 million) to set up a 6GW integrated solar module, cell, and wafer plant.
August 26, 2025
India installed 14.3GW of new utility-scale solar capacity in the first half (H1) of 2025, marking a 49% increase year-on-year.
Premium
August 22, 2025
Indian PV manufacturers are facing a double hit from US trade tariffs and anti-dumping measures on products sold in America. Shreeyashi Ojha reports on how these are impacting their business models.
August 21, 2025
National Thermal Power Corporation (NTPC), through its renewable energy arm NTPC Green Energy, has commissioned 212.5MW of solar capacity at its 1.25GW Khavda-I project. 
August 19, 2025
Indian renewable energy company SAEL Industries has signed two 880MW power purchase agreements (PPAs) with the Indian states of Gujarat and Punjab.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK
Solar Media Events
October 7, 2025
Manila, Philippines