EU ProSun requests extension of trade duties as old battlelines redrawn

September 8, 2015
Facebook
Twitter
LinkedIn
Reddit
Email

EU ProSun has formally requested an extension of existing solar trade tariffs placed on Chinese manufacturers in the EU.

The move, which was widely expected, is likely to reopen divides among the industry that reached fever pitch in 2013 when the current measures were announced.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

While protocol prevents comment on the matter from the European Trade Commission, a 'frequently asked questions' document circulated by ProSun tacitly confirms that it met the 7 September deadline to request an expiry review of the current measures. These are set to conclude on 7 December 2015.

If the EU agrees to the review, current duties and the minimum import price (MIP) structure agreed between Brussels and Beijing will remain in place until the investigation is complete. This will take a maximum of 15 months extending the trade defence restrictions until the end of 2016. A number of companies, including Canadian Solar and ReneSola, have been removed from the MIP.

In the FAQ document, ProSun claims to represent more than 25% of what it claims is Europe’s 6GW solar manufacturing industry. It also claims to have secured support from more than 100 installers in a period of two weeks. Typically in anti-dumping cases, installers oppose measures on the basis that they could drive up the cost of panels for them.

Anti-dumping measures typically last five years but the solar case was limited to just two years initially by former trade commissioner Karel de Gucht. This was in recognition of the fast pace of industry changes. ProSun has highlighted that he indicated that a review would be necessary after the two years were concluded.

James Watson, CEO of trade body SolarPower Europe said it was important for the sector for the MIP to be removed. SolarPower Europe, formerly EPIA, has changed its stance on the trade dispute from neutral to pro-free trade since the measures entered force in 2013.

“The removal of the MIP will help solar power in Europe to grow and support the European electricity market in achieving its challenging emission reduction goals,” Watson told PV Tech. “Consumers will be able to buy quality products manufactured at scale, at the best possible prices. State support for solar deployment can be limited to the absolutely necessary, with more kilowatt-hours being achieved for less cost following the continuously falling manufacturing costs of solar system components.”

“The uncertainty around the continuation of the MIP or a potential expiry review will be harmful for our sector, as the lack of clarity over when trade normality will be restored will deter investors. This is at a time when private investment is paramount for the development of our sector, as more and more government incentive schemes come to an end,” said Watson.

Read Next

December 19, 2025
Wang Bohua, honorary chairman of the China PV Industry Association (CPIA), said that the polysilicon production in China experienced its first year-on-year decline since 2013, while wafer production registered its first year-on-year decline since 2009.
December 19, 2025
'The UK market has matured,' Guy Lavarack, chief investment officer at the Luminous Energy Group, tells PV Tech Premium this week.
Premium
December 19, 2025
PV Talk: Luminous Energy's Guy Lavarack says that interface risk, grid risk and talent risk are all key risk factors in Europe.
December 18, 2025
The latest edition of our print journal, PV Tech Power, is out today and available to download, where we deep dive into PV quality assurance.
Premium
December 18, 2025
PV Talk: Paul Gebhardt of Fraunhofer ISE discusses reliability issues facing advanced PV modules, an issue which isn't going anywhere.
December 18, 2025
French renewables company Voltalia has started site preparation works on a 43MW/135MWh solar-plus-storage project in French Guiana, a French overseas territory in South America.

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
November 24, 2026
Warsaw, Poland