HelioVolt exit from PV manufacturing highlights failed US PV manufacturing strategy

February 25, 2014
Facebook
Twitter
LinkedIn
Reddit
Email

The news today that HelioVolt – one of the few remaining custodians of US based PV manufacturing – will cease operations is terrible news for the 100-plus employees that have been working hard at HelioVolt to advance PV manufacturing in the US.

But, at a time when the blame on US manufacturing seems to get pointed at the Chinese pricing, the statistics – in terms of the efforts in the US to get some kind of PV manufacturing base – are not good.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The US gambled on thin-film investments big time. This gamble was government-backed, VC-supported, and included almost every R&D resource available in the US. The strategy goes back to the 1970s (mostly with a-Si), but it is the past half-dozen years – largely with CIGS – that will be remembered the most.

There were about 18 firms in the US that sought to be global leaders in CIGS manufacturing a few years ago. Fourteen have exited the industry and two have been acquired by Chinese state-backed Hanergy.

With HelioVolt becoming number 14 to go (and noting that Hanergy is Chinese) this leaves only two. Neither of these has ramped up to mass production and each is looking for new investments.

Going back a few years ago, it was the success of these 18 CIGS firms that was meant to be the catalyst to Made-in-the-US, and supplying to the growing US solar PV market. Like every other country growing a domestic market, the US was no different. It wanted to have the supply meeting domestic demand. However, the gamble didn’t work.

As a consequence, the US needs imported PV panels – whatever anyone says about global PV pricing or about whether other countries (that equally wanted domestic manufacturing) did (or did not do) to support their local manufacturers.

Sadly, the future looks ever more gloomy for US based manufacturing. And while some seek to lay the blame at global pricing, much of the issues come down to technology-choice and trying to shift R&D into manufacturing at very high risk. Even when modules were well above US$1/watt, the US based thin-film sector was crumbling.

First Solar is, of course, the only real winner in the history of US thin-film investments, although it is interesting to note that Solar Frontier can also track its R&D heritage to activity in the US over 10 years ago. These companies have manufacturing in Southeast Asia and Japan, not the US, so it is not a great help to any American PV dream.

Therefore, while it is clearly a massive disappointment for those seeking to differentiate from c-Si based dominance in the industry, there is a stronger message here today regarding the US solar industry and how its gamble to generate a domestic CIGS manufacturing base has now all but died.
 

Read Next

November 28, 2025
The EBRD will invest in a 531MW solar PV portfolio in Romania from Israeli renewables company Nofar Energy.
November 28, 2025
The European Patent Office (EPO) has revoked a patent for a key solar cell manufacturing process, which has been hailed as “good news” for European solar PV manufacturing.
November 28, 2025
LONGi has acquired system integrator PotisEdge, and plans to launch an ‘Energy Storage One-Stop Solution’.
November 28, 2025
Chinese module manufacturer Huasun Energy has launched a new heterojunction module with a 760 W output, a 2,000 V system voltage and 24.5% module efficiency.
Premium
November 27, 2025
Prateek Tare tells PV Tech Premium how Distributed Energy Infrastructure transformed a Superfund site into the Acton PV-plus-storage project.
November 27, 2025
The World Bank will invest in a huge 4GW, 5.12GWh solar-plus-storage complex in Malaysia, which will form part of a pan-Southeast Asian power grid initiative.

Upcoming Events

Solar Media Events
December 2, 2025
Málaga, Spain
Upcoming Webinars
December 4, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy