HelioVolt exit from PV manufacturing highlights failed US PV manufacturing strategy

Facebook
Twitter
LinkedIn
Reddit
Email

The news today that HelioVolt – one of the few remaining custodians of US based PV manufacturing – will cease operations is terrible news for the 100-plus employees that have been working hard at HelioVolt to advance PV manufacturing in the US.

But, at a time when the blame on US manufacturing seems to get pointed at the Chinese pricing, the statistics – in terms of the efforts in the US to get some kind of PV manufacturing base – are not good.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The US gambled on thin-film investments big time. This gamble was government-backed, VC-supported, and included almost every R&D resource available in the US. The strategy goes back to the 1970s (mostly with a-Si), but it is the past half-dozen years – largely with CIGS – that will be remembered the most.

There were about 18 firms in the US that sought to be global leaders in CIGS manufacturing a few years ago. Fourteen have exited the industry and two have been acquired by Chinese state-backed Hanergy.

With HelioVolt becoming number 14 to go (and noting that Hanergy is Chinese) this leaves only two. Neither of these has ramped up to mass production and each is looking for new investments.

Going back a few years ago, it was the success of these 18 CIGS firms that was meant to be the catalyst to Made-in-the-US, and supplying to the growing US solar PV market. Like every other country growing a domestic market, the US was no different. It wanted to have the supply meeting domestic demand. However, the gamble didn’t work.

As a consequence, the US needs imported PV panels – whatever anyone says about global PV pricing or about whether other countries (that equally wanted domestic manufacturing) did (or did not do) to support their local manufacturers.

Sadly, the future looks ever more gloomy for US based manufacturing. And while some seek to lay the blame at global pricing, much of the issues come down to technology-choice and trying to shift R&D into manufacturing at very high risk. Even when modules were well above US$1/watt, the US based thin-film sector was crumbling.

First Solar is, of course, the only real winner in the history of US thin-film investments, although it is interesting to note that Solar Frontier can also track its R&D heritage to activity in the US over 10 years ago. These companies have manufacturing in Southeast Asia and Japan, not the US, so it is not a great help to any American PV dream.

Therefore, while it is clearly a massive disappointment for those seeking to differentiate from c-Si based dominance in the industry, there is a stronger message here today regarding the US solar industry and how its gamble to generate a domestic CIGS manufacturing base has now all but died.
 

Read Next

June 1, 2026
Nextpower has filed a patent lawsuit against GameChange Energy on the same day GameChange announced a strategic consolidation of its activities and rebrand.
June 1, 2026
SEG Solar will build a third module manufacturing plant in the US that will bring the company’s total manufacturing capacity to 10.6GW.
June 1, 2026
Grenergy has signed a 12-year hybrid power purchase agreement (PPA) in Chile linked to the fifth phase of its Oasis de Atacama solar-plus-storage platform.
Premium
June 1, 2026
What financing options are there for renewable developers who find themselves shut out of some of Europe’s supportive auction programmes?
June 1, 2026
EDF power solutions North America has signed a 30-year PPA to sell power generated at the 400MW Utah Solar 1 Energy project to the LADWP.
June 1, 2026
Indian independent power producer (IPP) Sunsure Energy has commissioned a 105MWp solar plant in Uttar Pradesh's Mahoba district.

Upcoming Events

Media Partners, Solar Media Events
June 2, 2026
Johannesburg, South Africa
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil