
Solar Energy Corporation of India (SECI) has issued a request for selection (RfS) document for the tendering of 200MW of grid-connected solar PV to be deployed alongside utility-scale battery storage in the state of Karnataka.
Each 50MW project is expected to be connected to 2.5MWh of storage capacity.
This article requires Premium SubscriptionBasic (FREE) Subscription
Unlock unlimited access for 12 whole months of distinctive global analysis
Photovoltaics International is now included.
- Regular insight and analysis of the industry’s biggest developments
- In-depth interviews with the industry’s leading figures
- Unlimited digital access to the PV Tech Power journal catalogue
- Unlimited digital access to the Photovoltaics International journal catalogue
- Access to more than 1,000 technical papers
- Discounts on Solar Media’s portfolio of events, in-person and virtual
Or continue reading this article for free
The tender for capacity in the Pavagada Solar Park comes under the National Solar Mission, phase II, Batch IV, Tranche VI.
SECI has already issued an RfS for 100MW of grid-connected solar PV projects with large-scale battery energy storage systems at the Kadapa Solar Park in Andhra Pradesh.