Kyocera Solar’s North American unit reaches 2 million module milestone

Facebook
Twitter
LinkedIn
Reddit
Email

PV module manufacturer Kyocera Solar’s North American facilities have exceeded the two million mark in the production of photovoltaic modules.

The company began manufacturing modules in North America in 2004 and has manufacturing sites in San Diego, California and Tijuana, Mexico. The modules produced have been used in residential, commercial and utility-scale projects across the Americas, Australia and other worldwide regions.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Steve Hill, president of Kyocera Solar, stated, “It took more than five years for Kyocera to reach the one million module mark at our North American operations and only two years to double it.”

Kyocera’s first PV modules were produced over three decades ago in Japan with production expanding to Tijuana in 2004 and San Diego in 2010.

Read Next

July 3, 2025
Renewable energy curtailment in Brazil is set to reach 8% across the country, and be as high as 11% in the north-east, by 2035.
July 3, 2025
Spanish IPP Zelestra has secured a €235 million (US$277 million) increase to its sustainability-linked loan, bringing the total to €770 million.
July 3, 2025
US tracker manufacturer GameChange Solar has introduced the Genius Tracker TF, a new terrain-following solar tracker system designed to deliver “the industry’s lowest grading requirement on challenging terrain.” 
Premium
July 3, 2025
Meeting the UK’s solar targets will not simply require the installation of new capacity, but investment in grid infrastructure and training.
July 3, 2025
TotalEnergies has expanded its renewables assets in the Caribbean, sold a stake in projects in Portugal and begun construction on two PV parks in Spain.
July 3, 2025
Malaysian engineering and infrastructure giant Gamuda has expanded its presence in the Australian renewables sector by partnering with Tasmanian landowners to build a 1.2GW portfolio, which includes solar PV.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 22, 2025
Bilbao, Spain
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK