C2 Energy Capital plans to install sheep at 86MW of solar projects

Facebook
Twitter
LinkedIn
Reddit
Email
C2 Energy Capital first introduced a flock of sheep at its Jacksonville operation, which provides power to Florida’s largest state utility, in 2018. Source: C2 Energy Capital

After successfully deploying more than 80 sheep to control ground vegetation at its 7MW Jacksonville Florida plant, renewables investor C2 Energy Capital plans to install flocks of sheep at 10 more solar projects totalling 79MW.

On-site sheep keep ground vegetation on a solar plant at bay, provide economic opportunity for regional farmers and mitigate an operation’s carbon footprint, according to the New York-based investor.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Michael Howell, C2 Energy Capital’s director of asset management said in a release that the project a “win-win situation that makes good business sense for everyone involved”. He said the sheep will be released on projects that cover more than 300 acres in three states during the program’s next phase.

C2 Energy Capital first introduced a flock of sheep at its Jacksonville operation, which provides power to Florida’s largest state utility, in 2018. Since then, a committed sheep crew have worked and slept on-site around the clock. The grazing sheep are protected by a Great Pyrenees guardian dog.

C2 Energy Capital is also a trialling wildflower planting program in the hope that it will limit mowing on-site while providing habitats for pollinators, particularly bees.

Read Next

Premium
November 6, 2026
PV Tech spoke with many industry experts about the midterm election results, covering topics such as permitting, state-level impact and investment appetite.
November 6, 2026
US tracker manufacturer FTC Solar has registered revenues of US$32.8 million in the third quarter of 2026, up both sequentially (25.4%) and year-on-year (26.1%).
November 5, 2026
Sunrun reports 5GWh of networked storage capacity in the third quarter of 2026, while solar additions reached 204MW.
November 5, 2026
Independent power producer (IPP) Energix Renewables has brought its 152MWdc Border Basin solar project online in Hancock County, Ohio, with the facility now delivering power to the PJM Interconnection market.
November 5, 2026
EDP Renewables North America has begun work on its 250MW Cypress Knee Solar project in Arkansas, which will eventually supply power to tech giant Meta.
November 5, 2026
Tristan Erion-Lorico and Song Hao of Kiwa PVEL examine the negative consequences of overreliance on module nameplate power ratings for PV project economics.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye