Nevada waves through 1.19GW/590MW solar-plus-storage hybrid

December 5, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
Nevada. Source: Flickr, Daniel Lobo

Nevada utility NV Energy has secured approval from the state’s public utility commission for a solar-plus-storage push that could see 1,190MW of PV capacity installed in southern Nevada by January 2024 alongside 590MW of energy storage.

The projects comprise a 200MW PV project with a 75MW five-hour battery system being developed by EDF Renewables North America; a 300MW solar array, including a 135MW four-hour battery system, being developed by 8minute Solar Energy; and a 690MW facility, including a 380MWac battery storage system, being developed by Quinbrook Infrastructure Partners in collaboration with Arevia Power.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The project trio and their related energy storage resources will create more than 3,000 unionised construction jobs.

The plans, first unveiled by NV Energy in July, remain largely unaltered by the utilities commission beyond a 10MW trim on the approved overall solar capacity.

Nevada is one of the US’ top solar states, with more than 3.5GW installed so far and more than 4GW more capacity expected in the next five years, according to the Solar Energy Industries Association. In April, a new state law came into effect requiring energy providers to reach 50% renewable energy portfolio standard by 2030.

Read Next

November 25, 2025
Renewables developer Plenitude will deploy perovskite-silicon tandem solar PV modules at a pilot solar project in the US.
November 24, 2025
US solar module manufacturer First Solar has inaugurated its 3.5GW vertically integrated manufacturing facility in the state of Louisiana, the company’s fifth factory in the US.
November 21, 2025
CPS Energy has issued a request for proposals (RFP) to acquire 600MW of new solar capacity through power purchase agreements (PPA).
November 20, 2025
US independent power producer (IPP) Arevon Energy has begun construction on a 124MW solar PV project in Illinois, its first utility-scale project in the state.
November 19, 2025
The US Department of Energy (DOE) will need to invest US$25 billion by 2030 to maintain its position as a leader in the global energy sector.
Premium
November 18, 2025
PV Talk: George Touloupas of Intertek CEA explains how the regulatory environment is ratcheting up for the solar supply chain.

Upcoming Events

Solar Media Events
December 2, 2025
Málaga, Spain
Upcoming Webinars
December 4, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal
Solar Media Events
June 16, 2026
Napa, USA