Premium

Minimizing utility-scale PV power plant levelized cost of energy using highcapacity factor configura

Facebook
Twitter
LinkedIn
Reddit
Email

By Matt Campbell, Senior Product Manager, SunPower Corp.

Solar photovoltaic power plants have emerged in recent years as a viable means of large-scale renewable energy power generation. A critical question facing these PV plants at the utility scale remains the competitiveness of their energy generation cost with that of other sources. The relative cost of electricity from a generating source can be compared through the commonly used levelized cost of electricity (LCOE) calculation. The LCOE equation evaluates the life-cycle energy cost and production of a power plant, allowing alternative technologies - with different scales of operation, investment, or operating time periods - to be compared. This article reviews the LCOE drivers for a PV power plant and the impact of a plant’s capacity factor on the system LCOE, as well as the effects of various factors such as capacity and geographical location. The economic tradeoffs between fixed and tracking systems are evaluated as well as a review of land use, plant operation and maintenance costs.

Published In

Premium
The fourth edition of Photovoltaics International was published in May 2009. It features an exclusive interview with First Solar’s Bruce Sohn on manufacturing and the future. SunPower also outlines the economic benefits of LCOE drivers in Power Generation and Fraunhofer IPA gives an overview of automation in the photovoltaic industry.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events, Upcoming Webinars
December 3, 2024
8.30am GMT / 9.30am CET
Solar Media Events, Upcoming Webinars
December 12, 2024
9am GMT / 10am CET
Solar Media Events
February 4, 2025
London, UK
Solar Media Events
February 17, 2025
London, UK