China sets 2016 solar cap at 18.1GW

Facebook
Twitter
LinkedIn
Reddit
Email
A 2GW project in China. Source: Huawei.

China has set its 2016 solar installation cap at 18.1GW and took significant steps to address curtailment and encourage consolidation, according to leaked documents being widely circulated in China and seen by PV Tech.

A statement by the National Energy Association (NEA) and copied to the National Development and Reform Council, puts the large-scale PV support cap at 12.6GW with a further 5.5GW available to higher-efficiency “top runner” projects.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

BIPV, rooftop and self-consumption projects will not be limited.

Three provinces with serious curtailment issues have been excluded, namely Gansu, Yunnan and Xinjinag, were not included in the figures as they do not currently have the right “market conditions” for additional projects, according to the document which was dated 5 June.

“Excluding various provinces is highly likely due to the prevailing grid curtailment and demonstrates the government’s acute awareness of, and determination to tackle this issue,” said Frank Haugwitz, Beijing-based founder of solar consultancy AECEA. “Overall, 18.1 GW, if realized, would mean the market would grow by 20% year-on-year,” added Haugwitz, who first flagged the document to PV Tech.

“The inclusion of 5.5GW of top runner projects, which are subject to competitive bidding, changes the regulatory landscape of China’s domestic market. If successful, the share of top runner is likely to increase in future. Past experience showed that the top runner programme somewhat favours larger companies, hence in future smaller stakeholders may face challenges to stay in business, which leads to a consolidation of the market,” said Haugwitz.

Local governments will have till July to raise any issues with the caps handed down by the national authorities.

It was unclear what fate awaits any projects in the three curtailed provinces.

There are currently only six approved module suppliers for top runner projects, Trina Solar, Jinko, JA Solar, Risen Energy, GCL Systems and Canadian Solar. Participation in the programme requires modules to meet minimum efficiency thresholds. These were set in 2015 at 16.5% and 17% for polycrystalline and monocrystalline modules respectively.

Additional reporting by Mark Osborne

10 March 2026
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

May 6, 2025
The global solar market will continue to slow in 2025 after 2024 saw the total capacity growth rate decrease by over 50%, according to a report from SolarPower Europe (SPE).
May 6, 2025
While other technologies exist, c-Si solar PV technology is the leading candidate for large-scale energy production, writes Radovan Kopecek.
May 1, 2025
CSI Solar, the PV manufacturing subsidiary of Canadian Solar, has posted massively decreased profits in Q1 2025 amid what it described as “high trade barriers” and “severe supply-demand imbalances”.
May 1, 2025
The ESMC has called for a restriction of remote access to PV inverters in Europe from ‘high-risk’ manufacturers, mainly those in China.
April 30, 2025
Almaden has announced plans to establish a wholly-owned subsidiary in the United Arab Emirates, via its existing subsidiary Almaden (MENA).
April 30, 2025
Daqo New Energy has posted gross losses of US$81.5 million, and a gross margin of -65.8% in the first quarter of 2025.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
May 7, 2025
Munich, Germany
Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK