India’s SECI tendering for 100MW solar with battery storage in Andhra Pradesh

Facebook
Twitter
LinkedIn
Reddit
Email
Storage will become increasingly important as solar capacity increases strain on the grid. Flickr: Pranav

Solar Energy Corporation of India (SECI) has issued a request for selection (RfS) for 100MW of grid-connected solar PV projects with large-scale battery energy storage systems at Kadapa Solar Park, Andhra Pradesh.

The tender will be part of the National Solar Mission (NSM) Phase II, Batch IV, Tranche V.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

In July PV Tech reported that SECI would soon be tendering for utility-scale solar-plus-storage projects with 100MW in Andhra Pradesh and 200MW in Karnataka, with each 50MW project connected to 2.5MWh of storage capacity.

Storage will beocme increasingly important in India as the rapid uptake of solar energy exerts strain on the grid.

Read Next

May 30, 2025
Waaree Solar Americas – a subsidiary of Indian solar manufacturer Waaree Energies – has signed a 586MW solar module supply agreement with an undisclosed independent power producer (IPP).
May 29, 2025
Singapore-based engineering firm Sembcorp has received a letter of award from Indian public sector power company SJVN for 150MW of solar power and a 300MWh battery energy storage system (BESS).
Premium
May 29, 2025
PV Talk: Global Solar Council CEO Sonia Dunlop tells Shreeyashi Ojha why the solar industry needs collective action to combat political and supply-chain disruption.
May 28, 2025
The expansion is 100% compliant with the Indian government's requirement of Bureau of Indian Standards (BIS).
May 27, 2025
India has shipped 12.5GW of module capacity in the first quarter of 2025, according to data from energy consultancy JMK Research.
May 20, 2025
Solar PV additions have slowed down in the first quarter of 2025 in India, with 6.7GW, according to a report from Mercom India Research.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
June 17, 2025
Napa, USA
Upcoming Webinars
June 30, 2025
10am PST / 6pm BST
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia