Italy limits net metering scheme to 200kW systems

Facebook
Twitter
LinkedIn
Reddit
Email

The Italian government has announced its net metering scheme will be limited to PV systems no greater than 200kW from 1 January 2013.

Revisions to the scheme, the government said,  will simplify the procedure for granting net metering, although it admits that greater standardisation is required.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Net metering is used as an alternative to the feed-in tariff. This mechanism grants the owners of the system 'credits' to use towards their energy bills if excess energy they produce is fed back into the grid.

The government has been criticised for its apparent lack of strong support for the Italian solar industry.

In November, Italian solar manufacturer association Comitato Industrie Fotovoltaiche Italiane sent a statement to the government warning against the detrimental effects of Conto Energia V, which severely scaled back the support available for renewables in Italy.

At the close of 2012, the European Photovoltaic Association demanded the European Union take action against member states curtailing support to the renewables industry.

Now, according to media reports, Italian PV industry associations Gifi, Assosolare and Aper has asked for an expansion of the scheme to systems up to 1MW, which they say would have helped the Italian solar sector to grow in a difficult market situation.


 

Read Next

October 21, 2026
The Shanxi Installation Group has selected Spanish engineering consultancy IDOM to design its 500MW Al Kamil I Solar Project in Oman.
October 21, 2026
Solar power generation facilities can be exposed to risks from the effects of hailstorms, snow and typhoons, according to kWh Analytics.
October 21, 2026
The EBRD has announced a US$265 million loan for a new 1.2GW solar PV plant, to be co-located with a 600MWh BESS, in Minya, Egypt.
October 21, 2026
Pivot Energy has closed a US$500 million bilateral corporate credit facility to further solar PV and BESS deployments.
October 21, 2026
China’s Ministry of Commerce is proposing to introduce export controls on key PV components, including polysilicon, wafers and cells.
October 20, 2026
JMK has released a report on curtailment of renewable energy in India, showing that solar PV curtailment reached 96.9GW in September.

Upcoming Events

Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye