Solar panels on Apple plant in Arizona catch fire

May 27, 2015
Facebook
Twitter
LinkedIn
Reddit
Email

Firefighters responded to an emergency at one of Apple’s facilities in Mesa, Arizona on Tuesday afternoon after a blaze broke out in an area of solar panels fitted to the roof of the building.

According to local news reports, firefighters identified that the fire erupting on the 12-hecatare site was located only on a section of the roof overlooking a loading dock.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

While around 50 people were forced to evacuate the building, over 100 firefighters were able to get the blaze under control in about 30 minutes, although a portion of the roof collapsed.

News reports noted that fire investigators are trying to find out if the fire was a direct result of the solar panels located upon the roof.

The facility features a lengthy history. First Solar was the original owner of the building, eventually selling it to Apple in 2012. Apple then leased it to GT Advanced Technologies (GTAT) in order to use the space as a factory to manufacture sapphire screens for handheld devices.

Ultimately, the sapphire-screen factory plans never came to fruition, as GTAT eventually filed for bankruptcy last year. As a result, Apple shifted the building’s purpose into that of a data centre, touting its green credentials.

Read Next

November 28, 2025
The EBRD will invest in a 531MW solar PV portfolio in Romania from Israeli renewables company Nofar Energy.
November 28, 2025
The European Patent Office (EPO) has revoked a patent for a key solar cell manufacturing process, which has been hailed as “good news” for European solar PV manufacturing.
November 28, 2025
LONGi has acquired system integrator PotisEdge, and plans to launch an ‘Energy Storage One-Stop Solution’.
November 28, 2025
Chinese module manufacturer Huasun Energy has launched a new heterojunction module with a 760 W output, a 2,000 V system voltage and 24.5% module efficiency.
Premium
November 27, 2025
Prateek Tare tells PV Tech Premium how Distributed Energy Infrastructure transformed a Superfund site into the Acton PV-plus-storage project.
November 27, 2025
The World Bank will invest in a huge 4GW, 5.12GWh solar-plus-storage complex in Malaysia, which will form part of a pan-Southeast Asian power grid initiative.

Upcoming Events

Solar Media Events
December 2, 2025
Málaga, Spain
Upcoming Webinars
December 4, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy