1.6MW Isle of Wight solar project reaches completion

April 5, 2012
Facebook
Twitter
LinkedIn
Reddit
Email

The Isle of Wight, located off the southern coast of Great Britain, has a new 1.6MW solar plant to thank for helping to contribute to its electricity grid. The project was completed using 80 strings, each with 88 solar modules, and outfitted with SunMaster CS20 inverters from Mastervolt. The company advised that this is one of the largest systems with sting inverters in Britain.

The plant features its own 33,000V transformer grid feed-in and was planned and constructed with help from Mastervolt.  “The Isle of Wight has long been an important location for Mastervolt: Many of the yachts cruising the magnificent sailing resorts around the island use our independent power supply systems. After all, Mastervolt is the global market leader for these systems. Being able to implement our largest British photovoltaic project to date on the Isle of Wight makes us particularly proud,” says David Craig, general manager of Mastervolt UK and Ireland.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

February 17, 2026
Lyra Energy has signed PPAs with three commercial and industrial offtakers covering a significant share of its 255MW solar PV project in Thakadu, South Africa.
February 17, 2026
US solar equipment provider Nextpower has signed a three-year deal to supply Jinko Solar with solar PV module frames, made in the US.
February 17, 2026
Researchers at Germany’s Fraunhofer Institute for Solar Energy have claimed two new record efficiencies in tandem PV modules.
February 17, 2026
Quality assurance provider Intertek has acquired Aerial PV Inspection, a specialist in drone-enabled solar site inspections.
February 17, 2026
Jupiter International has commissioned its 1GW third solar cell production line online at its Baddi facility in Himachal Pradesh.
February 17, 2026
Fixed-tilt trackers and bifacial modules installed vertically could be the most effective way of deploying PV systems in Arctic environments.

Upcoming Events

Upcoming Webinars
February 18, 2026
9am PST / 5pm GMT
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA