GCL-SI to supply 62MW of solar modules to Brazilian projects built by WEG

Facebook
Twitter
LinkedIn
Reddit
Email
GCL-SI said it would ship its GCL-P6/72 325W modules to WEG from September to November this year and is one of the first supply deals the SMSL member has secured in Latin America. Image: GCL-SI

‘Silicon Module Super League’ (SMSL) member GCL System Integration Technology (GCL-SI) has secured a 62MW module supply deal with Brazil-based engineering company, WEG. 

GCL-SI said it would ship its GCL-P6/72 325W modules to WEG from September to November this year and is one of the first supply deals the SMSL member has secured in Latin America. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

PV Tech previously reported earlier this year that WEG had won an EPC contract to build two solar PV projects of 31.12MW capacity each, being developed by Nordic Power Partners (NPP) at Coremas, Paraiba, in northeast Brazil.

Shu Hua, President of GCL-SI said, “WEG is a widely-respected EPC company in Latin America with years of experience in electrical engineering. We are delighted to be able to work with WEG on their local clean energy projects and to assist in the building of a greener living environment for the local community.”

GCL-SI also noted that the Brazilian market may well be focused on the utility-scale business, due to previous government tenders but highlighted that the distributed generation (DG) market was emerging as an area for potential growth.

Read Next

July 2, 2026
India's MNRE has urged the power regulator to retain separate 'Deviation Settlement Mechanism' rules for solar and wind projects to protect them against increased financial risks.
July 1, 2026
Firmus Technologies has signed a 12-year wholesale energy supply agreement with Gunvor Group, including 1.2GW of renewables by 2032.
July 1, 2026
A 1GW concentrated solar-PV hybrid complex built by China Three Gorges Corporation in Hami, Xinjiang has completed commissioning and entered commercial trial operation.
July 1, 2026
Canadian independent power producer (IPP) Boralex and its Swiss investor partner, Energy Infrastructure Partners, have secured €1.45 billion (US$1.65 billion) in financing to support Boralex's renewable energy business in France.
June 30, 2026
First Solar is facing a class action lawsuit from shareholders over its response to US tariff policy and alleged “misleading” statements about its resilience to the shifting policy landscape.
June 29, 2026
Over US$121 billion of investment across 92GW of renewables projects in the US is at risk from federal scrutiny, according to Wood Mackenzie.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
April 20, 2027
Istanbul, Türkiye